We did it like this. Same construction company, floor plan copied 95%, the friend gave his verbal consent, structural engineering still had to be recalculated (we rotated one room), building application submitted, started construction. Zero problems. The floor plan was completely designed by the friend himself. With an architect, it will probably be tricky, but how is he supposed to find out?