Hello,



.....so an installation level?! How much space is there between the drywall and the wooden board? Without an installation level, you will probably damage the foil when drilling.



If you pull the cable directly on the foil, you will certainly tear holes in it.

Regards
 

markus1207

2011-05-07 19:53:39
  • #2
The wooden panel and plasterboard are directly on top of each other, so there is no installation layer. The foil does not get damaged if you work carefully (of course, there must be no sharp edges at the end to be inserted). I installed about 150 boxes without damaging the foil (passed the blower door test with flying colors). And as already mentioned: if the foil is damaged around the drilling area, just put some tape on it and insert a windproof box.
Regards
Markus
 

E.Curb

2011-05-09 08:26:32
  • #3
Hello,



Drywall = 12.5mm; wooden panel max. 20mm.
How deep is the hollow wall box that can be installed there?



Where does the cable actually come from? It must be pulled into this layer afterward, which again causes a penetration of the vapor barrier.



Well, a bit of tape is not enough. You need special sealing tape and have to work very precisely --> vapor barrier!!
The airtightness layer is a very sensitive area. I can only advise against tinkering with it afterward. Either installation level or socket on the interior wall, which I consider the best solution anyway for this wall construction (which I would never plan this way).

Regards
 

Similar topics
05.01.2010Counter battens in the interior area for roof insulation26
29.02.2012What can be detected in a blower door test, which house values?18
19.05.2016New single-family house 180m²21
01.10.2016Planning of a roof renovation from 196312
21.04.2019Floor plan planning shortly before submitting the building application1420
20.05.2018Dense, well-insulated wooden house without plastic? (Vapor barrier)21
31.10.2018Concern about vapor barrier - air from ceiling outlet12
25.08.2020Blower-Door-Test result (n50=1.13)49
01.09.2019Interior plaster on the exterior wall is not complete24
02.10.2019Base plate - film against rising moisture15
19.12.2019Blower Door Test 1.7 with two hints22
04.02.2020Installation of additional insulation for underfloor heating - cables lie on the raw floor slab25
22.10.2020Floor plan optimization city villa + fill consideration1277
27.02.2020Is the vapor barrier in the roof vapor-permeable? Yes? No!16
27.06.2020Electrical installation in the attic?10
09.07.2021Building according to the Energy Saving Ordinance 2016 or KfW5543
04.11.2022Result of blower door test KfW 5521
09.10.2022How to seal cable installation on an exterior wall?12
05.02.2024Video doorbell system with two-wire, new construction32
14.03.2024Installation level including insulation - influence on the insulation of the exterior wall?12