Interior plaster on the exterior wall is not complete

  • Erstellt am 2019-08-19 18:13:20

Müllerin

2019-08-21 08:38:19
  • #1
Is it a wastewater pipe, right? Can't it be turned off again? (Sorry if this is a stupid comment, no idea if that's possible we have all pipes in the wall.)

Otherwise, you'll really have to do the rework yourself. I would do it.
 

Platzhirsch85

2019-08-23 21:45:51
  • #2
We have the problem in three corners: 1. Ventilation pipe wastewater 2. Exhaust pipe gas heating 3. Ventilation toilet + 2 flexible pipes of the solar thermal system According to the site manager, neither the drywall installer nor the foil is supposed to be wrapped around the pipe, and this foil should be glued to the plaster on the left and right of the pipe. My concerns: In the ceiling and floor area, the airtight layer is not complete....
 

Grantlhaua

2019-08-30 08:25:22
  • #3
People, people, people,.... What would they have done 20 years ago?

Just plaster the corner out a bit (doesn't have to look nice) and then box it in with drywall. Then it's airtight for your blower door test and done.
 

Dr Hix

2019-08-30 09:01:01
  • #4


The same, see Wärmeschutzverordnung from 1995, §4...
 

Grantlhaua

2019-08-30 09:07:38
  • #5


And even there the corner was just a bit knocked out.
 

Bookstar

2019-08-30 09:42:19
  • #6
Yes, that is really exaggerated, just throw it away and that's it.
 

Similar topics
05.01.2010Counter battens in the interior area for roof insulation26
29.02.2012What can be detected in a blower door test, which house values?18
06.03.2018Klinker or plaster? Durability / appearance?19
30.01.2015New building exterior facade clinker/plaster12
07.01.2016Controlled residential ventilation yes - heat recovery no - justification in the text!79
27.02.2016Where to lay pipes for controlled residential ventilation in the top floor ceiling21
01.10.2016Planning of a roof renovation from 196312
25.01.2017Blower Door Test for KfW 70 according to the 2012 standard?15
17.10.2017Additional bathroom through the builder or just laying pipes?10
21.04.2019Floor plan planning shortly before submitting the building application1420
07.02.2020Blower Door Test - Meaning of the Result35
20.05.2018Dense, well-insulated wooden house without plastic? (Vapor barrier)21
31.10.2018Concern about vapor barrier - air from ceiling outlet12
26.09.2019Is it allowed to lay KG pipes in gravel?11
19.12.2019Blower Door Test 1.7 with two hints22
18.04.2021KfW 55 - Ventilation system yes/no? - Experiences222
27.03.2021Which wall structure is meaningfully vapor-permeable?66
09.07.2021Building according to the Energy Saving Ordinance 2016 or KfW5543
11.11.2021How to seal pipes or entire openings11

Oben