What do you personally count as part of this?
- Construction site toilet :)
- Construction electricity/water
- Earth and foundation work
- Building permit
- Soil survey
- Surveying
- Possibly a structural engineer
- Connection costs for supply and disposal including construction cost subsidy, i.e. water, electricity, gas, wastewater, telephone.
- Possibly rainwater/infiltration system stuff
- Insurances
- Professional construction supervision
Everything else; so to no longer have to enter the house over Euro pallets, is for me the exterior work.
And regarding the architect, I assume it's an as-built report; meaning that is included in the price of the house.