End of March the excavator arrived, roof covered beginning of June, screed beginning of October and handover on 18.12.
Own work during the holidays and on 6.1. the first night spent in our own house. Oh yes, with basement
 

Grantlhaua

2020-02-10 11:40:26
  • #2
&

but without much own effort, right? Especially the 8 months from are really intense at Massiv & Keller.
 

Yosan

2020-02-10 13:29:01
  • #3
The excavator arrived in mid-April, we moved in now on February 8th. Our own work was "the usual," meaning laying floors, finishing walls and ceilings from Q2 onwards (we wallpapered one room, plastered the rest).
 

Baufie

2020-02-10 14:13:45
  • #4
Pretty much exactly 16 months.

Individual awarding completely on our own, except for the shell construction, which was done by the architect.

A huge amount of own work and then we had almost 4 weeks of "forced break" because the concrete plant had 2 machine breakdowns and could not deliver our filigree ceilings for the upper floor on time.
 

Scout

2020-02-10 14:33:00
  • #5
Basically just the floors (each 50 m2 tiles and wooden floorboards and 30 m2 rubber), some painting in the basement, and the first half of the kitchen assembled. After the move, there were still three weekends scheduled for renovating the old apartment...
 

MayrCh

2020-02-10 16:05:05
  • #6
I wouldn't say intense now. Groundbreaking at the end of February, move-in mid-October. Basement, solid construction. Including about 6 weeks standstill due to issues with multi-utility coordination and subsequent summer holidays. There would have been room for improvement. The team from is also setting a good pace.
 

Similar topics
28.01.2010House with or without a basement? - Experiences20
05.06.2010Basement made of high perforated bricks or concrete?11
18.08.2013Massive house with basement. Is our budget enough?11
08.12.2015Construction costs for KFW70 house with basement turnkey15
03.03.2012Position controlled residential ventilation in the underground basement?16
26.10.2012External perimeter insulation floor slab, basement mold risk11
09.06.2013Costs of earthworks without basement15
19.04.2013Budget for the construction of a single-family house with a WU concrete basement27
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
04.02.2018Floor plans for single-family house, approx. 140 m², without basement78
05.04.2019House purchase from the year of construction 2014 with 118 sqm living area and basement54
19.05.2021Evaluation cellar / settlement house Bavaria53
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
21.08.2020Floor plan of a single-family house with 4 children's rooms and a separate apartment17
27.10.2021Single-family house with basement in NRW - is our financing solid?43
02.01.2021City villa floor plan 180m², basement, 3 children - Your opinions on this?51
26.10.2021Evaluation floor plan approx. 145 sqm single-family house basement/ground floor/upper floor111
15.08.2023The same tiles throughout the entire ground floor and in the bathroom - also the same in the basement?30
09.09.2024Floor plan design: Single-family house with basement; 560 sqm plot65
17.06.2024Floor plan design for a single-family house with 165 sqm including a basement and light well20

Oben