How long was your construction period from groundbreaking to move-in? (Solid construction)

  • Erstellt am 2020-02-06 21:50:21

Grantlhaua

2020-02-10 21:24:31
  • #1


We actually had no standstill at all or I was partly at the construction site until 1 a.m. to get things done...and still we ended up at 51 weeks
 

Zaba12

2020-02-11 06:09:28
  • #2
The start of construction for us was on 16.10.18. It began with the neighbor's L-shaped stones. The pit for the basement was then excavated at the end of October.

Move-in was on 12.07.19. Everything was finished a week earlier. We built with individual trades. EL did the complete insulation before the screed, priming of the walls, and painting the KG themselves. Everything else was done (including 180sqm of floor tiles).
 