How expensive was your conscription / hidden costs?

  • Erstellt am 2023-07-20 19:56:38

tommyboy

2023-07-20 19:56:38
  • #1
Hello, I have received an initial offer from a prefabricated house provider. I understand that the price will not remain as is. Where did additional costs arise for you afterwards and in what amount? For example: The building and service description includes a doorbell, but no electric door opener. It may be a small thing, but such things add up... Thanks and regards Tom
 

sysrun80

2023-07-20 20:47:17
  • #2
Without the information about what is stated in the construction service description, you really can't say. For us, for example: * After the soil survey, a few thousand euros more were added for the foundation slab (which is included in the base price) * The electrical equipment was also insufficient for us (more network sockets, etc.) - 2000 euros extra * The standard staircase was awful - 3500 euros more. and it can drag on like this. In addition, there are of course "small things" that have nothing directly to do with the turnkey builder - house connections (water/electricity/...)
 

hanse987

2023-07-20 20:48:21
  • #3


It depends on what is already included in the construction service description and whether you have higher demands than what is included. The worst thing is what is not mentioned or where it says “besides,” because you are responsible for all of that.

Typical things are trades like electrical work. Usually, the lowest standard is included. Then quite a few additional sockets often come on top. Network cabling usually comes extra. Other things are tiles or sanitary fixtures where you want more expensive ones than those included.

If you are not deeply familiar with the topic, professional advice can only be recommended.
 

Benutzer123

2023-07-20 20:50:21
  • #4
We also received a price list for the optional equipment along with the construction and service description. A small selection was listed there, and one could already guess where this was headed. Doorbell to intercom system with 3 house phones was just under four figures.
 

WilderSueden

2023-07-20 20:54:39
  • #5
The biggest impact for us was the floor. Parquet instead of vinyl...and also in the bathroom even though we felt we chose at the lower end there. Bathroom showroom is just incredibly expensive though. Tiles were still quite okay
 

allstar83

2023-07-20 21:13:58
  • #6
Also take a look here:

https://www.hausbau-forum.de/threads/das-aufmusterungsranking-was-kam-noch-dazu.32773/
 

Similar topics
18.07.2012What should be considered in a construction service description?10
19.03.2014Comparison of construction performance description! What should we prefer?47
01.12.2016Construction company rejects change requests in construction service description and construction contract39
13.03.2017Construction planning, construction work description, cost breakdown19
02.08.2017Differences in tiles from the hardware store or tile center44
01.12.2017The bank may want a construction service description despite individual subcontract awarding26
31.03.2018Prices have been lumped after modification ideas of the construction service description10
01.08.2018Description of construction services - Performance assessment?12
29.10.2018Earthworks in the construction performance description17
12.04.2019Is the construction performance description detailed enough?14
14.11.2019Have you understood your construction service description?49
23.01.2020Construction work description - Thin slab foundation disadvantageous?11
17.04.2020Construction Performance Description Formulation13
21.03.202230 x 60 cm tiles Reason vs. Zeitgeist115
11.06.2021Construction performance description from the favorite - Is something missing?65
24.04.2022Comparison of construction work description regarding the base slab17
10.08.2022Foundation cushioning Town & Country house construction service description10
16.08.2022Evaluation of Offer + Construction Description of New Bungalow29
18.06.2023Assessment of offer, description of construction services12

Oben