House handover even though not everything is finished?

  • Erstellt am 2015-10-13 21:39:34

ypg

2015-10-13 22:33:16
  • #1
Also with us (Nds) there is only one building inspection with the construction supervisor. Edge: you can pour the screed height according to the covering in every room, but this must be announced by the client beforehand. This usually also means an additional cost. I can imagine that a tolerance of about 5-7mm is specified, if higher, then a strip is used that connects both heights. The numbers are given by my gut feeling ;)
 

Lassemann

2015-10-13 22:35:56
  • #2
Thank you, Yvonne. But I am not building with BU, but with an architect. He is paid to plan such things and to execute them at least as usual.

Does anyone know the VOB and the answer regarding the tolerance limit from it?
 

ypg

2015-10-13 22:56:53
  • #3
The tolerances will probably be in DIN 18202 - if you can't manage with that, I would take an expert with you during the acceptance. However, there will be large tolerances, after all, screeds can warp, which no architect can foresee or calculate beforehand.
 

Bauexperte

2015-10-14 00:09:49
  • #4
Good evening,


Then I assume that there are lockable olives that ensure safety until the balcony railing is completed?


This is a question that in my opinion cannot be answered solely based on the VOB, but among other things based on the specification for the screed installer. Additionally: was the basement guest room commissioned to be created as living space quality, or is it rather the case that existing space (with presumably little effort) should be converted into an additional guest area?

If the basement was declared as purely a utility basement in the building application, no one is at fault. The basement hallway – which belongs to the heated envelope – must be executed with insulation and possibly underfloor heating; in the other basement rooms, insulation and screed are generally omitted entirely (unless explicitly commissioned). Therefore, a step of about 5 - 8 cm results between the basement hallway and the other utility rooms.

If the basement was fully applied for, tendered, and commissioned as additional living space, I would ask your architect why he was asleep.

Rhine regards
 

toxicmolotof

2015-10-14 10:44:10
  • #5
Good morning , it is talking about 5mm, not 5cm!!!;-)
 

Bauexperte

2015-10-14 11:21:49
  • #6
Hello Tox,


Good grief ... how was it again with reading ... :confused:

With that, my post is of course obsolete and I agree with the architect; after all, craftsmen are not precision mechanics :D

Rhenish greetings
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
14.06.2011New building: Which insulation is appropriate?14
10.07.2011Wall construction and insulation for Kfw 70 house, okay?19
19.03.2013Turnkey or build with architects?19
21.07.2013Cost estimates from two architects differ greatly!10
13.11.2013Do you absolutely need an architect?10
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
30.01.2014Architect's cost estimation15
21.08.2014Construction costs when building with architects. What does your experience say?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
26.04.2021House made of concrete without additional insulation - monolithic12
30.04.2017Screed applied too high - room height consequently lower11
13.11.2017Distance between doors and floors 25mm17
29.01.2019Responsibility of the architect in case of KfW interest and further matters148
09.10.2018Costs for shell construction and roof covering/insulation - fixed price offer okay?25
15.01.2020Deviation of actual values from planned values17
22.08.2022Is insulation useful with Poroton bricks?19
24.01.2023New construction - Is insulation worthwhile? Experiences?25

Oben