- #1
Our bathtub should have been lifted into the upper floor before building the roof structure, as it is quite large and weighs 200kg. In fact, it arrived a day later and six carpenters had to carry it up my DIY construction stairs, poor things. Anyway, at that time we still had to come up with a plan for the thing because there was, of course, no screed yet. So we placed the tub on an OSB board with two rolling boards screwed underneath to be able to move it at least a little. We had to modify the door openings with an angle grinder to get from room to room. When the screed arrived, we had to pull the tub up on the rolling boards with a block and tackle attached to our main purlin and then temporarily stored it on a construction over the stair railing until the screed was dry.
Long story short: you could also hang the devices on hooks from the ceiling.
Long story short: you could also hang the devices on hooks from the ceiling.