Financing with KFW, expert's signature

  • Erstellt am 2015-04-13 18:37:10

ypg

2015-04-13 21:19:50
  • #1


There you can see how powerful your 3D tools are You don't need that.
I think you are not that far yet, otherwise you would already have a BU with cost item and calculation.

I would sign the loan as late as possible, eventually the commitment interest will apply... That happens faster than you think!
You have your credit limit, your calculation too, now the BU and its calculations are missing, and then it goes to the bank
 

Bauexperte

2015-04-13 21:49:29
  • #2
Good evening,


That´s why you go to the bank first and clarify your budget. "First" btw. means before you even consider having a single conversation, let alone buying a plot!


Oh man …

The system is not "badly thought out," nor can you take recourse against the CC. The CC can´t be blamed for the nature of your plot or your budget restrictions, to name just a few items that can run differently than planned.

The right way would be to design the floor plan with an architect or a CC you trust, and if everything fits—including the chemistry—sign the contract (after review). Include the clause: "A free right of withdrawal is agreed if xyz is not achieved. Costs incurred up to that point (such as the building application or static calculations on the client’s request) are to be borne by the client." As a contracting partner of a mechanical engineer, I would have included in the contract that the smallest unit of measurement in construction currently is not a µ; that creates some leeway.


You do know there is a difference between the profession of a mechanical engineer and that of an architect/statistician/geologist/mason, etc., right?


You get that with reservation from most financial institutions; they are not from yesterday and know about the processes involved in building a house.


Ask yourself whether you would work for air and love …


You only need the online form 153 if you want to use KfW funds. The CC of your choice will provide you with the form filled out once the contract is signed. Or you sign beforehand that you will bear the costs in the worst case, then it works without a contract.


Security is always relative

Rhenish regards
 

Voki1

2015-04-13 21:57:07
  • #3
The troll is being fed again.
 

Bauexperte

2015-04-13 22:04:14
  • #4
Good evening,


Troll? Have you known the engineer for a while ...?

Rhenish greetings
 

Voki1

2015-04-13 22:07:23
  • #5
I have ignored two people in all the forums I am registered in (there are a few). He is one of them. I have really only read nonsense here so far.
 

Payday

2015-04-13 22:15:01
  • #6
How can you read me but ignore me at the same time? Kind of childish...

Thanks for your answers!
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
19.03.2013Turnkey or build with architects?19
21.07.2013Cost estimates from two architects differ greatly!10
13.11.2013Do you absolutely need an architect?10
28.04.2014Cost estimate - contract for work16
07.05.2015Have the work contract checked by a professional37
06.07.2015Termination of work contract for house construction (before construction)14
06.12.2016Contract for work before property purchase - real estate acquisition tax?10
22.02.2016Signature of the work contract before financing?15
04.07.2016Purchase of property under a work contract12
19.07.2016When did you sign the work contract? Prior planning?12
08.12.2016Form for the State Statistical Office10
08.08.2018Withdrawal from the work contract within the withdrawal period23
26.09.2019ScanHaus Work Contract Additional Agreement14
27.01.2020How do I get out of a contract for work?11
11.02.2020Withdrawal from the work contract (The shell construction simply does not start)33
07.05.2022Work contract with exclusion §14/1522
01.07.2023Provision interest and deadlines of the house building company in the work contract13
06.08.2023Work contract individual or lump sum?11