Expert: For which construction phases is it urgently necessary?

  • Erstellt am 2018-09-07 14:13:38

trapjaw

2018-09-07 14:13:38
  • #1
Hello everyone,

we will soon start construction through a developer.

Now the question arises for us regarding an expert. We actually wanted to hire him for all construction phases. The seller agrees but advised us to save money by hiring him only for the shell construction. It wouldn’t be worthwhile for the interior work.

What is the opinion here and are there possibly any experiences?

Best regards

Michael
 

trapjaw

2018-09-07 15:19:27
  • #2


That means?
 

Obstlerbaum

2018-09-07 15:36:50
  • #3
Equally serious mistakes can be made during the interior finishing as during the shell construction. If an expert is involved, then for all phases.
 

11ant

2018-09-07 16:38:53
  • #4
If you were the builder, I would also point out that even an expert construction supervisor can no longer remedy something during the shell construction phase: namely make up for missed detailed drawings - see the construction ordeal story of .

As a buyer, you will be even less able to intervene earlier, but the construction phase should at least be accompanied until handover.

However, this must be agreed upon, as the builder and holder of house rights is the developer. Basically, the expert cannot compel the developer to do anything, at most they can demonstrably point something out to them - but ignored warnings can then only possibly be secured as evidence regarding their effects.
 

Snowy36

2018-09-07 16:56:01
  • #5
Who would then, for example, check your screed?
 

Bookstar

2018-09-07 17:19:07
  • #6
What exactly should be checked on the screed? You can see yourself if something is wrong.

I think a building surveyor is no longer necessary after the shell construction is completed.
 

Similar topics
11.08.2009Interior finishing costs - total cost planning12
14.11.2011Shell construction still this year15
05.09.2015Cracks in masonry (shell construction)14
13.06.2015New construction with developer / construction drawing documents23
07.05.2016Buying a shell construction - Experiences21
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
05.08.2017Screed necessary? Unfinished but insulated attic23
07.10.2017From when must the shell construction be dry or sealed?16
27.08.2018New building shell construction selection: Choose a company or architects?52
07.10.2018Styrofoam under screed and underfloor heating - What is the name of the product?12
09.10.2018Costs for shell construction and roof covering/insulation - fixed price offer okay?25
09.01.2019Final invoice for shell construction (200 sqm, clinker, without basement, roof) ok?24
16.01.2020Screed no functional heating after 7 weeks20
28.05.2020Buy a 25-year-old shell structure42
26.10.2020Kitchen measurement in shell construction mode13
20.10.2021Wait with the windows until the roofer is finished?12
25.11.2021Getting rid of moisture from the shell construction - how to ventilate and other topics18
12.09.2022Damp wall due to lack of ventilation after screed39
27.11.2023Assessment of costs for the shell construction and total costs (plaster, screed)17
23.12.2023Broken tiles warranty? New apartment from the developer13

Oben