Tom1607
2018-04-24 08:41:09
- #1
In the cabinet there is an SLS in front of the meter. Unfortunately, it is too small in the picture to see what kind it is. Then at least 2 RCDs have to be installed, I only see one. Normally, these fuses are ONLY made for the heat pump circuit, which means that a distribution must actually take place BEFORE the fuse. So I would ask the electrical guild for an expert and have them take a look at it. The distribution box is MAXIMUM shoddy work!!