Bauling2018
2018-11-07 18:44:01
- #1
So here is the solution:
The construction company made 2 core drillings into the slab and inserted pipes. They dug a hole from the outside and pushed a pipe under the gravel towards the core drilling. The whole process was done twice. This was for the toilet and the washbasin. For the shower, we are making a side drain; we already gain 40 cm there and for the remaining 30 cm they will remove some concrete without cutting any rebar, and the rest disappears into the 6cm insulation on the floor.
The construction company made 2 core drillings into the slab and inserted pipes. They dug a hole from the outside and pushed a pipe under the gravel towards the core drilling. The whole process was done twice. This was for the toilet and the washbasin. For the shower, we are making a side drain; we already gain 40 cm there and for the remaining 30 cm they will remove some concrete without cutting any rebar, and the rest disappears into the 6cm insulation on the floor.