Construction work list! Verification!

  • Erstellt am 2019-08-06 17:29:10

Leergut64

2019-08-06 17:29:10
  • #1
Hello dear experienced community,

I would like to present to you my simply bad bill of quantities from my developer.
The costs are structured as follows:

295,000 Euros "turnkey"

The individual costs are as follows:

Shell construction 147,500 Euros (of which planning, building application, building file, building permit 59,000 Euros)
Completion of insulation 23,600 Euros
Facade 5,900 Euros
Roof truss 14,750 Euros
Completion of roof 14,750 Euros
Heating and sanitation work rough assembly 20,650 Euros
Heating and sanitation work final assembly 5,900 Euros
Electrical rough 8,850 Euros
Electrical final assembly 2,950 Euros
Window delivery 14,750 Euros
Window final assembly 14,750 Euros
Plastering work without auxiliary plaster 7,375 Euros
Screed work 7,375 Euros
Tiling work 5,900 Euros

Total 295,000 Euros

The service description is attached as a PDF.

Key data

157 m2 / 2.5 stories / gable roof 30 degree pitch / gross floor volume 870 m3 / without basement
With underfloor heating / guest WC sanitary and 1 story.
 

ypg

2019-08-06 17:44:08
  • #2


And why?
 

HilfeHilfe

2019-08-06 18:29:57
  • #3
Yo what do you want?? Exams cost money!
 

nordanney

2019-08-06 19:18:05
  • #4
If it is bad for you, then you don't need our advice. What do you not like about it? Does he offer too cheap and high-quality? Or too expensive? Or poor quality?
 

hampshire

2019-08-06 19:18:43
  • #5
Doesn't ring a bell, no level of detail.
 

Leergut64

2019-08-06 22:30:32
  • #6


Unfortunately, I didn't have time to convert it into a PDF.
I hope the pictures help you.

For the people who can't/won't help, I don't hold your comments against you.
Give yourselves love

Regards







 

Similar topics
27.02.2015Burglary-proof windows?33
03.06.2014Interior design - windows14
16.01.2018Is an extra charge for colored windows realistic?19
18.06.2014Inspector defect identification, determination of window installation10
18.05.2016Help needed with window arrangement!32
27.05.2015Huge problem with condensation on the window34
20.12.2019Trefz window prices and experiences?14
26.01.2015Window between two rooms13
13.03.2015Opinions on window parapet height sought30
16.02.2016Question about contractual completion14
03.09.2016Buy the kitchen more than a year before completion?54
31.07.2016Electrical inspection, Q2, bathroom tiles, knee wall, floor-to-ceiling windows23
08.08.2016Payment before or after completion of the construction phase?51
28.02.2017Are securities customary for completion and warranty?24
19.08.2018Strategically well-planned handover completion under building supervision11
29.09.2020Building permit before completion of development31
14.11.2021Sell an apartment from a two-family house immediately after completion34
16.12.2021Convert towel radiator to electric or disconnect it18
01.07.2022Construction delay without completion. The house simply is not finished21
27.04.2024Replacing electric radiators with inverter air conditioners13

Oben