The guarantee also applies to the services included in the [Bauleistungsbeschreibung].

However, during construction, there are so many things that are not included or that one wants additionally that quite a sum adds up.
- Tiles (additional cost for higher-quality tiles/for type of installation/for tile size/edge finish/additional sealing measures, etc.),
- Sanitary (any deviation from the standard I find really expensive here including bathroom furniture - shower enclosures, for example, were not included in any [Bauleistungsbeschreibung] I have read),
- Electrical (number of sockets/LAN),
- Additional burglary protection for windows + doors,
- Lightning conductor,
- Snow guards
- Roller shutters (manual/electric)
- Underfloor heating
etc.
 

ypg

2015-04-30 13:56:01
  • #2


One does not exclude the other.
With the GÜ (general contractor contract), the house has a fixed price, but then the soil report requires higher reinforcement, better statics, more complex earthworks. That's when the buffer you set aside for the fittings can come into play.
We naively estimated 500 for the carport... but of course we didn’t want a DIY store carport, but an aluminum carport including professional foundations, which are never factored in.
Spontaneously, during the construction phase you want a second outdoor faucet, the garage then with electricity, the tiles done by yourself turn out to be more expensive, and no one said that glue is expensive ;)
You can’t get the outdoor lighting for 10 €, and now you want eight in a row on both sides because you planned it nicely, but without bulbs. The satellite system also doesn’t appear in any construction service description... and so on and so forth...

Or do you know how expensive a mailbox is? :)
 

ypg

2015-04-30 13:57:01
  • #3
... and the often neglected rainwater drainage, with our cistern it cost another 5000 :(
 

toxicmolotof

2015-04-30 15:19:37
  • #4
I believe it never hurts to have around 10% of the construction costs lying around somewhere (or to know that the bank would refinance such an amount).

And I have never seen a construction project that was calculated sufficiently from the start including all extra wishes. Not one!

Either the bank helped out or the own reserves.
 

Sebastian79

2015-04-30 15:35:25
  • #5
Either invest your own effort or simply forgo something - or negotiate with the craftsmen. These options still exist - foregoing is the easiest and at the same time the hardest :D
 

Similar topics
18.07.2012What should be considered in a construction service description?10
19.03.2014Comparison of construction performance description! What should we prefer?47
14.01.2016Own contribution - what did you do and would you do it again?79
03.12.2015Own effort - What can be sold well at the bank?64
27.01.2016Own contribution - how to present it to the financer?12
22.03.2016Turnkey vs. ready to move in, own contribution17
21.03.2016Own work - floor coverings, painting, tiling, what else?40
01.12.2016Construction company rejects change requests in construction service description and construction contract39
13.03.2017Construction planning, construction work description, cost breakdown19
02.08.2017Differences in tiles from the hardware store or tile center44
07.11.2017Construction costs turnkey solid house34
01.12.2017The bank may want a construction service description despite individual subcontract awarding26
31.03.2018Prices have been lumped after modification ideas of the construction service description10
01.08.2018Description of construction services - Performance assessment?12
19.02.2019Which task is worthwhile to do yourself?67
14.11.2019Have you understood your construction service description?49
21.03.202230 x 60 cm tiles Reason vs. Zeitgeist115
10.11.2021Tiles for basement from the hardware store29
02.02.2022Own work in new construction - what makes sense and is feasible?66
29.11.2022Support for materials with own contribution19

Oben