first of all, thank you very much for your answers, which have really helped me a lot. After reading them, I still have the following questions:

1. We will have tiles in the size 45 x 90 cm laid in the living room and hallway. Is it likely that tiles of this size will be installed using the buttering-floating method? (I will only be able to speak with the tiler in a few weeks.)

2. Would the combination of a higher build-up due to the tile adhesive, possibly a slight slope in the area of the last tiles before the parquet begins, and the use of a Schlüter profile as a finish allow for a seamless transition between the different floor coverings?

3. Even though, according to the builder, the movement joints in the screed are set according to technical requirements, and understandably the builder does not want to commit: Is it relatively likely that such a movement joint would have to be located at the transition between the open kitchen and the living room, i.e., practically at the end of the partition wall between the hallway and the kitchen?

Thank you!
 

nordanney

2020-03-19 18:56:07
  • #2

Not just likely...

Yes

That’s reading a crystal ball, but it certainly makes sense at least there.
 

Baunovize

2020-03-19 20:29:40
  • #3
Thank you for your assessment, nordanney.

You have really helped me a lot. Now I see much more clearly.

Thank you once again for your answers.
 

OWLer

2021-06-28 08:32:00
  • #4
Since our screed is supposed to be laid this week, I'm bringing this up again.

We are getting 10mm tiles and 13mm parquet. I would have just continued with the screed = one height. Including adhesive, according to the tile installer, we would reach a height of 13-14mm.

Otherwise, it would only be a difference of about 2mm or so. That wears down, right?
 

halmi

2021-06-28 10:36:50
  • #5
I hardly believe that the screed guy will magically create a difference of 1.5mm for you, that probably still lies within the tolerance range. You don't need to worry about that in my opinion.
 

OWLer

2021-06-28 10:49:25
  • #6
I have often read here that you should lower your mechanical engineering requirements on the construction site. So the covering has to compensate for that. I will discuss with the tiler that he puts a bit more adhesive in the transition areas.
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
06.05.2015Living/Dining/Kitchen: How do you live or how will you live?52
27.08.2014Planning living space & kitchen of a semi-detached house in Nuremberg13
26.02.2015Living room floor plan ideas?39
08.01.2018Stairs in the hallway, the floor plan is actually already done :o(20
10.05.2015Screed uneven - defect removal refused52
12.09.2016Living room: How to arrange the sofa, TV, and cabinets?32
27.10.2016Combination of tiles and parquet in the living room with an open kitchen30
01.12.2016Floor plan living room-kitchen18
09.02.2018Floor plan for a 150 sqm single-family house with a living room facing north21
01.01.2018Order tiling materials yourself - tiles12
07.10.2018Styrofoam under screed and underfloor heating - What is the name of the product?12
13.02.2019Tiler costs 200m² new construction42
09.10.2019Screed and tiles already laid but no heating14
10.11.2019Tiles or vinyl in kitchen and hallway19
22.12.2020Is it allowed to lay tiles on fresh screed?12
10.11.2021Open kitchen: regret or the ultimate experience?104
25.02.2022Too much moisture in the single-family house after screed installation? Risk of mold?49
24.02.2023What kind of flooring in the utility room on screed - DIY, tiles?34

Oben