Hello, the building application documents are currently being prepared. The house is planned to get a carport one to two years later. Without, as well as with a carport, it would be a simplified approval process (according to the development plan). I would have the documents (structural analysis etc.) for the carport provided to me in advance by the manufacturer. 1. Is it advisable to include this directly in the building application and have it approved together? I imagine that this could save me approval costs (authority/architect) in two years. 2. Can I then build the same carport but from a different manufacturer? 3. What would be the approximate costs for the approval of a carport? Thank you very much for your help!
 

Bauexperte

2014-05-22 09:20:31
  • #2
Hello,


As long as the carport actually fits the specifications of the development plan, I would take it directly into the building application in your place.


What is approved is - if anything - a piece of carport with "x" parameters, not a manufacturer/provider of carports ;)


For manufacturers/providers of prefabricated garages, this service is usually included in the offer price for private customers. Although I rarely sell carports – they are almost as expensive as prefabricated garages – I assume it is no different with offers for carports. The costs for the separate approval should be in the range of the approval for the simplified approval procedure, so about € 50.00.

Rhenish regards
 

ypg

2014-05-22 12:16:40
  • #3
As the construction expert says - we did it this way: the architect took a carport "from himself" with our measurements for the building application. The carport will be built later, but with a different manufacturer. Important for a building permit is the placeholder for a possible edge development with measurements. When you realize what a building permit is actually for, it almost explains itself.
 

Similar topics
15.02.2011Building permit application12
27.09.2018Cost of building permit in exemption procedure, new construction11
05.10.2014Approval procedure for moving a house15
15.06.2015Garage - Building Application - Confusion36
27.12.2015Who has built with an architect? Experiences??85
28.11.2024Neighbor's lawsuit against approved building permit46
16.01.2017No building permit as long as the land is not developed?10
01.02.2017Building application is becoming increasingly complicated!20
27.04.2017Carport deviation from the building application21
04.08.2017Building application or building notification15
06.12.2017Constantly making the same mistakes in the building application - stupidity or intent?44
20.11.2020Wait with the building application because of the child construction allowance1354
11.05.2018Construction application costs only 40 euros due to exemption application?27
14.10.2018Building application - delay due to neighbor's lawsuit - experiences?21
04.01.2019Terrain modeling different from the building application - allowed? (NRW)36
25.11.2019Exemption procedure or building permit40
05.08.2020Building a garden shed... Is a building permit necessary? Detours?17
15.08.2021Duration until the issuance of the building permit in BW57
30.07.2021Is building without a building permit possible?26
30.11.2021Fee notice for building application57

Oben