Topsoil and excavation for the foundations goes to the side
I assume with a minimum distance of about 1.5 m. That should roughly fit with 400 sqm. Why not just dispose of it right away? You won’t need it later anyway and it will just be in the way, right?
Foundations are approximately 70 m3
Excavation only 60 cbm, so that means removing about a 20 cm layer. Foundation 70 cbm, so about 80 cm deeper excavation.
Should roughly fit when roughly calculated. But in the end it will still be more and more expensive :) Also think about all the piping that the civil engineer has to carry out ...