The plot is 600 sqm. The sqm prices here are 80 euros per sqm. The house should be about 120 plus 60 sqm in size.
180 m2 plus ancillary construction costs are from 400 TE on a top-level plot. Only if your husband has all trades at hand and is on a brotherhood basis with all of them (so that they practically slave for him for free) could the 300 TE mentioned above perhaps be scratched. So, with still a lot of own labor, rather 350 TE would be feasible.
That would always be without exterior work, without basement, without kitchen, without garage. With land at 50 TE on top, we come to at least 400 TE building sum – with zero equity and 1000 euros free plus 500 rent, I find that already very shaky.
The KfW would give you 5 TE per apartment for a KfW Efficiency House 55. If the house builder achieves that as well, no problem. If it costs extra, you just have to recalculate, but with the building sum, 2x 5 TE are also peanuts. Otherwise, with the KFW 153 program, there are 100 TE as a loan, which is usually less favorable than at the bank (somewhat higher interest and only 10 years term) but ranks second in the land register. This way you can get the main loan itself cheaper.