Hello everyone,
this year we will build a single-family house with a slab foundation in northern Bavaria. For this, we have received an offer for the earthworks, which seems excessively high to us in some positions.
We would greatly appreciate a brief assessment!
The soil class is between 3 and 4.
here are the relevant key data:
- Delivery and compaction of frost protection gravel 0/32 for house subgrade and driveway: 700 tons, 24,500 €
- Excavation, removal and disposal: 405 m3, 7,690 €
- Topsoil removal and lateral storage: 505 m3, 750 €
- Excavation of channel, foundation and pipeline trench: 77 m3, 3,650 €
- Installation of split layer 2/5: 108 m2, 1,320 €
- Installation and bedding of KG pipes DN100, separate system: 82 linear meters, 4,250 €
- KG pipes DN150 for sewer connection up to 3 m depth 11 linear meters, 594 €
- Filter fleece GRK3: 200 m2, 785 €
- Deliver and install monolithic cistern approx. 8 m3 with McClean filter and animal protection: 2,930 €
- Drilling into existing inspection shaft 2x, drilling connection seal, creating slope: 700 €
- String line framework: 760 €
- Surcharge for structural engineer preparation: 445 €
- Lay stainless steel earth conductor in excavation and connect to potential equalization in slab: 55 linear meters, 964 €
- Multi-utility package from Hauff with 4 entrances: 1,255 €
- Cable protection pipe DN 90: 30 linear meters, 520 €
- Cable protection pipe DN 75: 12 linear meters, 180 €
- Connector multi-utility empty conduits to cable protection pipes: 4 pcs, 360 €
- KG connection funnel AT from Hauff as floor penetration: 6 pcs, 410 €
Subtotal: 52,063 € —> with VAT approx. 62 thousand €
Slab foundation (KFW40) with VAT: 24,500 €
Total price approx. 86,500 €
this year we will build a single-family house with a slab foundation in northern Bavaria. For this, we have received an offer for the earthworks, which seems excessively high to us in some positions.
We would greatly appreciate a brief assessment!
The soil class is between 3 and 4.
here are the relevant key data:
- Delivery and compaction of frost protection gravel 0/32 for house subgrade and driveway: 700 tons, 24,500 €
- Excavation, removal and disposal: 405 m3, 7,690 €
- Topsoil removal and lateral storage: 505 m3, 750 €
- Excavation of channel, foundation and pipeline trench: 77 m3, 3,650 €
- Installation of split layer 2/5: 108 m2, 1,320 €
- Installation and bedding of KG pipes DN100, separate system: 82 linear meters, 4,250 €
- KG pipes DN150 for sewer connection up to 3 m depth 11 linear meters, 594 €
- Filter fleece GRK3: 200 m2, 785 €
- Deliver and install monolithic cistern approx. 8 m3 with McClean filter and animal protection: 2,930 €
- Drilling into existing inspection shaft 2x, drilling connection seal, creating slope: 700 €
- String line framework: 760 €
- Surcharge for structural engineer preparation: 445 €
- Lay stainless steel earth conductor in excavation and connect to potential equalization in slab: 55 linear meters, 964 €
- Multi-utility package from Hauff with 4 entrances: 1,255 €
- Cable protection pipe DN 90: 30 linear meters, 520 €
- Cable protection pipe DN 75: 12 linear meters, 180 €
- Connector multi-utility empty conduits to cable protection pipes: 4 pcs, 360 €
- KG connection funnel AT from Hauff as floor penetration: 6 pcs, 410 €
Subtotal: 52,063 € —> with VAT approx. 62 thousand €
Slab foundation (KFW40) with VAT: 24,500 €
Total price approx. 86,500 €