If you don't have a basement and a relatively flat plot, then I find the €15,000 for the earthworks questionable. Try to include the earthworks in the construction contract, for example, up to about 80cm. If you have to haul away soil, be sure to get a quote beforehand. Our neighbors were completely ripped off with their 50m3.
Be careful if you want to calculate the volume beforehand. Add about 50% for loosening.