toxicmolotof
2014-12-01 19:18:39
- #1
The year 2014 is done as far as signing contracts is concerned, unless the thing is already completely planned with everything included.
Similar topics | ||
10.09.2010 | Does Allkauf Haus offer a full basement for 9999€?! | 18 |
14.05.2016 | Allkauf house financing condition | 50 |
25.05.2015 | Extractor hood / roof or wall | 14 |
03.03.2015 | Insulating the roof with kitchen paper/toilet paper | 12 |
24.05.2015 | KfW 55 with wooden house - U-values: Wall 0.18 - Roof 0.16 | 17 |
05.05.2016 | Insulate the roof: flakes, panels or wool | 17 |
07.03.2020 | Children's room on the upper floor open up to the roof | 25 |
20.09.2016 | Extending walls beyond the roof?! | 43 |
28.02.2017 | Purchase of a shell construction | 25 |
10.03.2017 | Roof design / Use of 2nd floor mandatory with 2 full floors | 23 |
20.10.2017 | Roof with photovoltaic or other investment, any experiences? | 19 |
12.09.2017 | Roof constructed too flat - Construction company does not acknowledge the defect | 12 |
21.10.2017 | Sealing the base slab before the roof is installed | 19 |
20.04.2018 | Roof covered with fake tiles - house accepted. | 12 |
31.05.2022 | Cancellation of the installation appointment at Allkauf Haus - costs or compensation? | 36 |