So far only complications for which no one was to blame.
The building ground was apparently great (greenfield), but during the foundation excavation, cellar vaults filled with construction debris and scrap, as well as a brick well, came to light. Everything had to be excavated and backfilled; the soil expert recommended a deeper frost protection strip and edge reinforcement for the slabs. Fortunately, everything was within the financial buffer.
Connection costs of the utilities were also significantly higher than planned, totaling 18,000 euros instead of the estimated 10,000 euros, with the SW connection to the sewer network alone costing 11,500 euros. ops:
With the developer, we have only had good experiences so far; everything went smoothly (current status: screed installed, remaining are only the installation of sanitary and electrical fixtures, drywall partitions, and tiles) and without any craftsmanship complications. The only issue is that the terrace door does not close 100% properly but will be adjusted soon.
The building ground was apparently great (greenfield), but during the foundation excavation, cellar vaults filled with construction debris and scrap, as well as a brick well, came to light. Everything had to be excavated and backfilled; the soil expert recommended a deeper frost protection strip and edge reinforcement for the slabs. Fortunately, everything was within the financial buffer.
Connection costs of the utilities were also significantly higher than planned, totaling 18,000 euros instead of the estimated 10,000 euros, with the SW connection to the sewer network alone costing 11,500 euros. ops:
With the developer, we have only had good experiences so far; everything went smoothly (current status: screed installed, remaining are only the installation of sanitary and electrical fixtures, drywall partitions, and tiles) and without any craftsmanship complications. The only issue is that the terrace door does not close 100% properly but will be adjusted soon.