What are the next steps for the new single-family house construction project?

  • Erstellt am 2022-08-03 08:31:31

fyaylmf

2022-08-05 01:10:27
  • #1
ok, thanks for your assessment. I can understand that. My architect usually also goes for individual contracts. I just want to do it as economically as possible and am therefore considering whether a general contractor would be cheaper, for example if they bring an architect and structural engineer with them.
 

jrth2151

2022-08-05 12:24:02
  • #2


Didn't you read through the building application before submitting it? I went through my building application at least 5 times completely before it was submitted. I even found 1–2 errors. Architects also make mistakes, they are only human. At the end of the day, however, it is your money and your house, so I consider it very important to be exactly informed. For the future, I would recommend you to go through everything very carefully anyway, especially if you want to carry out the construction through individual contracting.
 

fyaylmf

2022-08-05 13:33:35
  • #3
Of course you do. I also found mistakes but I no longer had that in mind when I wrote the post. I also have a lot going on otherwise. As I said, I am of the opinion that the construction method may be approved, but a change in the construction method does not invalidate the entire building permit. And it was important to me to submit the application at least once. Everything takes quite a long time here and I want to have something in hand now so that I can go to the bank.
 

jrth2151

2022-08-05 13:39:51
  • #4

Well, with us even moving a window requires a new approval. I don’t think you can just switch from brick to a prefabricated house. The structural engineering also has to be approved by the architect. That, of course, changes completely as well.
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
29.10.2013Property reserved, construction financing plan, architect/building permit application21
12.08.2014Construction method: Prefabricated house Solid house Construction supervisor Architectural planning18
11.11.2014The Old Suffering - Turnkey/Individual Contract38
04.08.2017Building application or building notification15
27.10.2017Construction description by architects: Who has experience?13
06.12.2017Constantly making the same mistakes in the building application - stupidity or intent?43
11.07.2018Architects / Civil Engineer Service, Execution Plan, Scope26
29.01.2019Responsibility of the architect in case of KfW interest and further matters148
27.08.2018New building shell construction selection: Choose a company or architects?52
17.12.2018What is set in stone in the building permit application?10
05.08.2020Building a garden shed... Is a building permit necessary? Detours?17
25.09.2024Architect search Munich + surrounding area (recommendations?)15
05.06.2021Single-family house city villa approx. 180 sqm + separate apartment 70 sqm - open design23
15.11.2021Wishlist for the architect32
06.01.2022Problems with architects - approval procedures18
18.01.2023Architect performance phase 1-4 - Which documents are required?33
25.06.2022Is the cost estimation by the architect realistic?39
23.01.2025Energetic House Renovation: Is it sensible to involve an architect?13
20.03.2025Planning by general contractor or independent architect?22

Oben