Thank you for the background explanation. I also have the impression that this developer is trying to stay significantly below the competitor’s price. Which also succeeds through less good equipment in the standard package.
I imagine the insulation of the basement as a special request. Ideally even a central controlled residential ventilation system, but I fear the developer or general contractor will not agree to that.
My approximate calculations:
Perimeter insulation of the basement walls: €7000
Complete insulation of the basement floor: €3000 (internal insulation, since with a shared floor slab probably nothing else will be possible)
Controlled residential ventilation system: €10,000
Is this realistic?
I am not yet quite sure about the necessity of the basement floor insulation (regarding moisture in the basement).
Or only the later usable room will be insulated on the floor, the technical and storage room only on the outer walls. Could thermal bridges with condensation risk again arise from this, or would that be okay?
I will also discuss this with the later construction supervisor, but I would appreciate hints from you.
Regarding the new post from W. Pickartz:
The sales advisor told me during the conversation that this is a clearly preliminary building specification. They have only started now so that the deadline for the Kfw70 funding would not become too tight. Otherwise, everything would have initially been finalized in early January and a proper building specification created.
Regards
Ricardo
I imagine the insulation of the basement as a special request. Ideally even a central controlled residential ventilation system, but I fear the developer or general contractor will not agree to that.
My approximate calculations:
Perimeter insulation of the basement walls: €7000
Complete insulation of the basement floor: €3000 (internal insulation, since with a shared floor slab probably nothing else will be possible)
Controlled residential ventilation system: €10,000
Is this realistic?
I am not yet quite sure about the necessity of the basement floor insulation (regarding moisture in the basement).
Or only the later usable room will be insulated on the floor, the technical and storage room only on the outer walls. Could thermal bridges with condensation risk again arise from this, or would that be okay?
I will also discuss this with the later construction supervisor, but I would appreciate hints from you.
Regarding the new post from W. Pickartz:
The sales advisor told me during the conversation that this is a clearly preliminary building specification. They have only started now so that the deadline for the Kfw70 funding would not become too tight. Otherwise, everything would have initially been finalized in early January and a proper building specification created.