Terraced house - Financial framework, land + construction financing

  • Erstellt am 2015-04-20 13:41:21

Musketier

2015-04-21 10:18:57
  • #1
That is all speculation. With 3 salaries in that range, you won’t manage it.

Let’s calculate 650K€, plus additional construction ancillary costs. Depending on whether it is 1 large multi-family house, 2 large semi-detached houses, or 4 terraced houses, you’re looking at roughly 50-120K€ more, plus the land for the houses. That should certainly not be less than 300K€ in that range. In my opinion, nothing works under one million.
 

Bauexperte

2015-04-21 11:55:33
  • #2
Hello Dani,


If you equate "prefabricated house" with "fast," I have to disappoint you; that is not the case!

I have attached a block of terraced houses that we designed in Grengel under almost the same conditions. To reach 120/130 sqm, it takes a bit more than 70 sqm of built area per house. The model has external dimensions of 6.95 x 11.00 m per house and offers 59.53 sqm on the ground floor, 58.32 sqm on the upper floor; the attic awaits 45.48 sqm to be inhabited. The basement can house plenty of equipment and storage space with 59.00 sqm.


I stick to the above example:

3.00 m clearance + 6.95 m + 6.95 m + 6.95 m + 3.00 m clearance * 11.00 m plus 4.00 m terrace + 10.00 m garden = 671.25 sqm required plot size. The actual plot size suitable for your building project depends on the floor area ratio typical in Berlin; if it is 0.3, more land is needed, if closer to 0.4, then less land. So something between 800 sqm with a floor area ratio of 0.3 or 600 sqm with 0.4; it of course also depends on your preferences for garden size.


In terraced house construction, calculations have to be made differently than I stated to the Doc in an earlier response; there I assumed a multi-family house solution :) Each house is calculated with its own technology and equipment, only 3 common walls and the construction site setup reduce the price; possibly there is a “small bonus” from the builder as he can handle 4 houses in one contract.

I estimate you will end up around EUR 235,000 for a terraced house including a usable basement; incidental building costs depend on how you set up the public connections. For example, it is possible that two houses share one public connection; incidental building costs for 4 terraced houses will certainly be in the range of EUR 60,000–80,000. You should not forget the required funds for painting & flooring, landscaping, and reserves for nice-to-haves.


You want to live together as a family; therefore, if I were you, I would also consider a multi-family house solution. You will find an example attached; although somewhat larger with 465 sqm, it can serve as an example. The solution with condominiums also has the charm that one apartment can be rented out or, in the worst case, sold.

You should also consider foregoing a usable basement for the terraced house construction; it is mostly storage anyway, and the basement costs are in my opinion too high for that ;)

Edit:

Before you get ideas about houses here or misinterpret prices, all financing members should visit a bank/financier of their trust and hear what total financing is feasible. Only when you know the amount can you see what is possible for you to realize!

Rhenish greetings

 

Similar topics
18.06.2013Too few incidental construction costs or is the cost breakdown okay?16
13.09.2014Multi-family house: arrangement of residential units, trees, etc.35
03.11.2015Underground garage for a multi-family house beneath a detached single-family house13
05.01.2016Multi-family house for rent12
15.03.2016Developer changes plot size25
02.06.2016Multifamily house - Building savings contract & pre-financing sensible?24
09.06.2016Project multifamily house: Questions about costs and procedure24
04.07.2016Multi-family house with 3 or more apartments as a prefabricated house18
30.10.2016Multi-family house as a capital investment in an aging city70
16.10.2016Construction ancillary costs not visible?14
12.11.2016Extremely high pellet consumption (200kg in 3 days) in a Kfw70 multi-family house!37
20.04.2017Development plan for a multi-family house16
04.09.2018Building a home - The beginning is always difficult - How does it start?37
15.05.2020Multi-family house with 6 residential units - Current status and next steps13
20.09.2020Feasibility assessment: Multi-family house design by the architect?11
04.11.2020Planning a multi-family house - optimizing costs73
02.09.2021Planning of multi-family house 1200 €/m²58
04.05.2021Multi-family house without spouse involvement - ownership question28
03.09.2021Photovoltaic system at the multi-family house. 100% approval from the homeowners' association?27
26.05.2025Which heating system for a multi-family house, heat pump not eligible for subsidies?23

Oben