Semi-detached house in Hamburg with general contractor on own land, two + full attic floors, no basement

  • Erstellt am 2025-07-26 12:27:31

11ant

2025-07-26 16:16:55
  • #1
Earlier I overlooked one point ... ... and I missed another: Reporting on the decision of the preliminary building inquiry would be enlightening. Move the nonsense about divisibility to the trash. This is a highly potent killer criterion that can destroy many plans and drastically increase the costs of all others, so that the destruction would have been the lesser evil. Changing the object in a serious case is the vastly cheaper solution.
 

Rübe1

2025-07-26 16:27:20
  • #2
Edith was too late to add this:

The kfw only grants funds within the framework of the budget funds provided by the federal government (voluntary benefits). In case no one has noticed yet, there is still no approved federal budget, meaning the kfw is still drawing from last year's federal funds. When those are all used up, nobody knows what will happen then. Will new funds be provided for this fiscal year, will the program be discontinued/restarted? That will really put you in a tough spot...
 

ypg

2025-07-26 16:52:56
  • #3
I personally don’t understand why one can’t provide information like, for example, 20x40 (meters), nor post a handwritten sketch of the property showing orientation, dimensions, streets, as well as the neighborhood.

Well, Hamburg, possibly Schnelsen or something similar (basically doesn’t matter), nobody wants to know that anyway.
Also, the requested companies are not of interest as long as you deal with them yourselves.

The most important aspect is that a) you can hardly build living space for less than 3000€/sqm anymore. And if expensive soundproof windows are required on top of that, then definitely not.
For 400,000€ you will not get 165 sqm built.
The second big mistake is the thought that b) you can simply divide a house on a relatively small plot into two adequate apartments.
How do you imagine living comfortably on 65 sqm minus technical room minus staircase?
That leaves you with about 53 sqm with a tiny shower-toilet, which is hardly usable. Plus an 8 sqm small office, which is supposed to serve as a bedroom?! That is then also not barrier-free just because it is on the ground floor.
Upstairs then a family bathroom, but no free space. Also no adequate parking space for two residential units.
Such thoughts are .so. secondary because they stand in the way of planning a simple and functional residential building.

Who advises that? That is nonsense! Why should concrete be better when it concerns your own house?
Then all wooden and prefabricated houses wouldn’t be full value..!?!
I don’t understand this repetition of the word anyway. The opposite of full value is inferior.
What comes to my mind is that your divided residential units are rather inferior because they are not comfortable and adequately livable.

But now, let’s get to the point: show the design!
 

1689owen

2025-07-26 18:00:24
  • #4
That is helpful! Please keep it up.



--> Ok, it has been thrown into the trash. We can "easily" part ways with that.


I am not really familiar here. I’ve done some research but cannot assess what the structural and cost differences are between kfw55 vs kfw40 vs kfw40+ (vs kfw40+QNG, which we definitely don’t want). We were told sums of around 10-15k€ for the energy consultant, but presumably additional costs would also come in construction and materials. We don’t necessarily need that. But I thought the regulations in Hamburg were not so far from kfw40(+), probably I was quite mistaken.
If that could be "thrown into the trash" as easily as the other, one matter would be settled. BUT ...

That raises the question of how the financing is to be managed without funding programs (or maybe with ifb from Hamburg?, I don’t know the conditions...). If I’m not overlooking anything, higher overall interest and limits on duration and rate would put the cut-off below 40k€. Where/how should we proceed here? What would be your advice? We will certainly bother a financing advisor about this again, but it surely wouldn’t be wrong to have a few ideas first.


Both parties have a very good relationship, have a lot in common and would like to support each other, so we want to try to decide as many framework conditions as possible together (although the details and especially the decisions about what is done as DIY will differ — but neither party will do entire construction phases on their own).

Your, , advice was even to select companies independently (and possibly separately) after the shell construction. I think we would rather prefer some organizational simplicity here if it is financially possible. But maybe that conflicts with the other goals?


Where does the advice for the wood builder come from? We have so far only considered masonry and solid construction. What have we overlooked?



It was meant as dormer, sorry. We don’t really have problems with the full-storey line or boundary distance because it is about the lateral clearance area. Of course, there are details to clarify, but I don’t see problems there. But I may also have overlooked something (which is not unlikely, currently I seem to overlook everything). I might open another thread in the coming days in which I’ll post drawings and list a few questions about prioritizing roof pitch, story height, etc.


The semi-detached houses with II+D that I quickly found in a few other appearances all have a studio variant upstairs as well, so that concrete ceiling + dormer would probably mean significant redesign and extra cost. Right?


One more time here (I think I understand better now where this advice comes from): So visit an architectural office and have a plan made? But that certainly costs money. If then I build with another general contractor, that money might be (partly) gone. Or should we first look for a few more general contractors, modify their catalog houses and have offers made? And only then consider whether to go to an architectural office? What would be the advice here — and what does the advice depend on?

Thanks in any case!
 

nordanney

2025-07-26 18:06:03
  • #5
1. The money is not gone. Someone else just has it. 2. Every planning costs money. With an architect you see the invoice; if the GC plans, it is included in the total costs. 3. With a plan from the architect you can a) build solidly or b) as a timber frame and both 1. with GC or 2. with individual trades
 

1689owen

2025-07-26 18:40:43
  • #6

Well, the money is gone with me. And then with the architect. But maybe a general contractor who works according to his own method would prefer to do his own (re)planning, which will then cost me money again, so that I partly pay twice and am stuck with the additional costs. Or where am I thinking wrong?

__


See just now (we wrote at the same time). It’s already moved to the trash bin. That could simplify the entire thread here.


On the one hand: No idea what actual building requirements are linked to the aircraft noise. Triple glazing?

On the other hand: We don’t need 165 sqm anyway.
(a) I probably expressed myself unclearly:

What was meant: 165 sqm of lawn on the plot will be converted into 165 sqm of concrete slab. Each half of the house therefore has a ground floor area of 164 sqm / 2 = 82 sqm, so a living area of (let’s say) 0.7 x 82 sqm = 57.4 sqm. If I calculate GF + 1st floor + attic, I get 172.2 sqm of carpeted floor, which is of course not so much living space because of the attic. Maybe the 165 sqm even fits as a figure.

(b) We can definitely forego a few sqm, but a “full” attic (more on this below) would be nice and reasonable.

Maybe like this (all sqm values are just rough estimates):
Ground floor: living-dining area with kitchen (30 sqm), utility room (8 sqm), guest bathroom (one unit with shower) (5 sqm), rest (14 sqm) divided between hall and another room (guest/work).
1st floor: bathroom (10 sqm), all three children’s rooms (3 x 10 sqm), another room (guest/work, 10 sqm), rest hallway (7 sqm).
Attic: master bedroom, possibly office, one unit also a bathroom with shower.

The master bedroom may be small. But it would be nice to have this third level with independent rooms so that the parents are sensibly separated from the children. Maybe it doesn’t have to be a concrete ceiling for that, but if there should be walls and proper heating etc. upstairs, you’d have to think about it... The budget of course sets limits here. In which direction would further thinking make sense? Plan without attic? Plan attic to be expandable later, but wait (as long as parents live on 1st floor, no guest room)? Attic only as storage (what to forgo to have one more room downstairs)?


As described above: walls and proper connection to heating and ventilation in the attic. BUT: Please ask further, maybe something is buried here that we haven’t fully thought through yet.
 

Similar topics
13.02.2015KfW Energy Efficient Building11
10.04.2015Cost estimate architect single-family house. Your assessment44
19.06.2015Build according to KFW 70 or the Energy Saving Ordinance 201442
03.08.2015Semi-detached house with 2 residential units KFW10
06.05.2016Single-family house floor plan with basement, version 223
10.05.2016KfW funding for two-family house26
20.08.20162 residential units on 185 sqm of land?!21
13.06.2017Architect or developer? Which is more affordable?13
01.05.2021KfW loan + repayment grant for granny flat39
10.12.2017Second residential unit in the house due to KfW funding 15313
05.02.2020Roof insulation from KfW 55 to KfW 40 on the floor of the attic12
28.03.2021KfW funding for 2-3 residential units possible despite self-use?10
18.04.2021How does one correctly balance between the Building Energy Act and KfW 55, 40, and 40 Plus?45
08.05.2021New building with granny flat - general contractor restricts rental and KfW funding51
12.06.2021Install laundry chute in shower?96
05.07.2021Additional costs for residential units98
17.08.2021House costs per KFW level per m²32
06.09.2022KFW 461 - Complete renovation to energy-efficient house - Residential units17
19.07.2023Double KFW 297 funding through two residential units?16
26.03.2025Is KfW 261 renovation with a large extension eligible for funding?13

Oben