I spoke with the tiler 30 minutes ago.
He did not perform a CM measurement because decoupling was done. Special mats were installed, which are used precisely because the residual moisture does not matter. I remember they were orange mats with small air holes. According to him, there should never be any problems because of this.
PS: However, I have one question. We did not have tiles laid on the upper floor. Can I assume that the screed is now dry after 65 days so that I can lay flooring there?