Good day,

We finished the soil replacement work today and next week the general contractor will begin with all other trades. We want to have all measurements and energy requirements checked by a building surveyor. For this, the [Energieeinsparverordnung] would be relevant. When asked, our developer stated that we would receive this after completion, because the contract says that all construction documents can be collected after the house is completed.

However, in this way we could never verify all requirements, for example which perimeter insulation is planned for the floor slab and whether this thickness will also be maintained. What can be done here?
 

Lumpi_LE

2020-07-08 11:28:18
  • #2
If it really is a developer, you can't do anything, it is his house. When it is finished, he hands it over to you, just like when you buy an existing property.
 

knalltüte

2020-07-08 11:47:08
  • #3
You could at least, provided you are allowed to enter the property, check what is being installed and (photo)document it. Afterwards, compare IST <> SOLL.
 

user281

2020-07-08 12:01:52
  • #4
Hello, thank you for the feedback. I may have used the wrong term. I meant that we signed a construction contract with a construction company (which I believe is called "Generalunternehmer" in this case), according to which they build a turnkey house for us. We have already purchased the land ourselves. So the construction company then builds the turnkey house on our land. Does that change anything?
 

Lumpi_LE

2020-07-08 12:12:09
  • #5
Oh right, then you must have the plans as well, after all you have to sign them for approval.
 

user281

2020-07-08 12:26:45
  • #6
The architect did that. According to the contract, she is responsible for all inspections and construction preparations. We had the building application at her office back then, which she had completed entirely, signed. We also have a copy of the building application here, but without these two documents. These are apparently no longer mandatory parts of the building application.
 

Similar topics
29.10.2013Property reserved, construction financing plan, architect/building permit application21
08.10.2014How do you search for a suitable property developer?30
13.06.2015New construction with developer / construction drawing documents23
16.02.2016Question about contractual completion14
15.03.2016Developer changes plot size25
10.09.2016Construction financing and contract with the developer24
02.12.2016Plots in Cologne only through developers?54
21.07.2017Buying a terraced house from a developer - contract content?71
05.09.2017Developer or general contractor! Safety?30
17.10.2017Property developer or independent architect26
30.08.2019Must developers indicate immense embankment height/costs?12
26.02.2019Submit a building application before the land is paid for?11
06.06.2019Completion date in General Contractor Agreement - Wording assistance62
06.01.2020House purchase, prefabricated house from the developer with land10
13.07.2020Developer does not want to offset lump-sum damages with installments19
27.02.2021Prefabricated house including land planned - financing45
24.11.2021Plot of land in sight - looking for tips, tricks, suggestions39
22.12.2024Floor plan changes for end-terrace house from the developer133
25.12.2023Behavior in case of imminent delay by the property developer48
22.07.2024Dividing land for a duplex, how to best sell the second half14

Oben