Pull cord of the blind torn. Is there a warranty against the developer?

  • Erstellt am 2018-08-04 10:06:43

italiano83

2018-08-11 21:36:31
  • #1
Wow, thanks already for the answers. Attached is a picture so we all know what I mean.. as far as I see it, this is part of the house and therefore under warranty.. The 600 euros are not a rumor. I can gladly upload the offer. Looking forward to feedback
 

italiano83

2018-08-11 21:40:08
  • #2
Attached is the offer from the company ...
 

ypg

2018-08-11 22:26:32
  • #3




Why should it not be a fixed component of the house?!
An outlet or a window handle is as well, even though you could replace them. It was installed by the general contractor.

Nevertheless, I don't believe it falls under the warranty.
Take a look at your contract, the exceptions are written there.
In my opinion or knowledge, some components only have a 2-year warranty, specifically those that are constantly in use and exposed to other influences such as human or wind forces (or for example silicone joints due to aging of the material).
 

italiano83

2018-08-11 23:03:13
  • #4
Our contract says absolutely nothing about defects. So far, all existing defects have been eliminated. But here he is very resistant.

And the fact that a silicone joint is a maintenance joint goes without saying.
 

ypg

2018-08-11 23:14:00
  • #5


This is also not a construction defect, but rather a defect caused by strain and/or use.
A construction defect is a different category.
 

Alex85

2018-08-12 11:17:43
  • #6
The offer is really something. One piece of assembly/repair but billing by effort ... yeah, sure, it doesn’t get more non-transparent than that. So the one piece of assembly ends up costing double or what? If he wants to bill by effort, then the hourly rate has to be set. Or he makes a flat rate (one piece ...). Although €330 net for assembly ... that’s two people for three hours each at €55 net per hour. Quite a hassle for such a broken little band, right? I would get another offer.
 

Similar topics
16.06.2011Conclude a construction contract under reservation?10
13.09.2012Feeling pressured into a contract, is that normal?17
29.09.2011Is construction pre-planning without signature / contract legally valid?12
16.05.2015Contract unclear: humus earth collectors10
04.07.2016Building without a contract - Concerns?39
07.07.2016Is exclusion of warranty possible in the offer for time and material work?14
10.09.2016Construction financing and contract with the developer24
10.09.2016Warranty and movable goods28
11.06.2019Is there a warranty also on heating / air pump?13
28.05.2017Plundering the Riester contract - for less need for credit?16
25.05.2018Water damage due to heating. Warranty according to VOB12
16.08.2018Civil engineering works without a contract - normal, experiences?10
18.10.2018Liability for various defects after acceptance of the property19
06.06.2019Completion date in General Contractor Agreement - Wording assistance62
09.03.2021Withholding payment for defects in the shell construction74
09.05.2021Price adjustment clause in the contract with the general contractor18
24.12.2021GU insolvency after acceptance - Open defects15

Oben