haydee
2019-01-27 18:07:15
- #1
Hello Haydee, thanks for your quick response. Do you think the floating part of the building makes the building significantly more expensive? Because that would be excluded for us.
You have executed the slope support on one side, the structural engineering, and the base slab differently.
I am not an expert but if I look at what a bit more steel here, a few centimeters thicker there (retaining wall, base slab, floor slab) costs us, definitely five-figure.
I think with a house like this you have to be careful what you change. It immediately loses its impact.