Prefabricated house provider, company BMH (Build My House)

  • Erstellt am 2014-10-28 12:26:16

Irgendwoabaier

2014-10-30 07:13:17
  • #1
So... for us, the planning phase would have been independent of the question prefab house / solid house. The construction phase was a bit shorter - neighbors started building solid on a base plate last March and moved in just before Christmas. We started this year at the end of March with excavation for the pit and are now moving into our 'prefab house' in November. The advantage of the solid construction is certainly that the neighbor was still able to lower the windowsill and bottom edge of a window during the construction phase. The biggest problem at the moment is getting appointments with the craftsmen. They are all so well booked here. The problem is also reflected with the prefab house manufacturers - they are often very busy as well, so that the prefabrication in the factory is the bottleneck here...
 

Doc.Schnaggls

2014-10-30 12:35:01
  • #2


Hello,

however, production is not the problem for some prefabricated house manufacturers. Here, switching to 2 or even 3-shift operation could be done without major problems.

At our provider, the bottleneck is currently the selection of equipment. The employees required for this must be knowledgeable about all fittings - basically from the different cellars, plaster, windows, doors, sanitary, tiles, electrical, heating, chimneys, wallpapers, floor coverings (...etc.) to the roof tiles.

Of course, this knowledge and experience cannot be imparted in a short time.

When we went for the equipment consultation, a total of 14 (!!!) couples were guided through their equipment selection in parallel.

Best regards,

Dirk
 

Similar topics
29.09.2009Prefabricated house, comparison to noise pollution in solid construction11
22.01.2010Prefab house vs. solid house - Please urgently need advice!!29
03.05.2011Prefabricated House Pros and Cons16
01.03.2011Cost of architect services for prefabricated house13
30.05.2012Massive house costs KFW 70 - Prefabricated house65
23.05.2013Comparison of solid house versus prefabricated house39
27.02.2013Turnkey prefabricated house - total price okay?59
26.12.2012Prefabricated house / solid house, which construction companies?16
17.09.2017Prefab House Forum - Complete house possible for 150,000?29
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
02.09.2013Which heating system for prefab houses: air source heat pump, geothermal, solar, photovoltaic17
29.08.2013Prefabricated house (wood) vs solid construction (stone on stone)11
05.07.2013Solid house or prefabricated house? Which suits us better?18
23.06.2014Prefabricated house or solid construction - what is your opinion?45
25.06.2014Financial requirements for building a prefabricated house55
06.01.2020Prefabricated house vs. solid house - price difference?37
21.02.2017Renovate the core of the old house or build a prefab house?16
11.12.2017Prefabricated house in solid construction - Which construction company27
15.09.2017What can be done with a prefabricated house on your own?14

Oben