So... for us, the planning phase would have been independent of the question prefab house / solid house. The construction phase was a bit shorter - neighbors started building solid on a base plate last March and moved in just before Christmas. We started this year at the end of March with excavation for the pit and are now moving into our 'prefab house' in November. The advantage of the solid construction is certainly that the neighbor was still able to lower the windowsill and bottom edge of a window during the construction phase. The biggest problem at the moment is getting appointments with the craftsmen. They are all so well booked here. The problem is also reflected with the prefab house manufacturers - they are often very busy as well, so that the prefabrication in the factory is the bottleneck here...
 

Doc.Schnaggls

2014-10-30 12:35:01
  • #2


Hello,

however, production is not the problem for some prefabricated house manufacturers. Here, switching to 2 or even 3-shift operation could be done without major problems.

At our provider, the bottleneck is currently the selection of equipment. The employees required for this must be knowledgeable about all fittings - basically from the different cellars, plaster, windows, doors, sanitary, tiles, electrical, heating, chimneys, wallpapers, floor coverings (...etc.) to the roof tiles.

Of course, this knowledge and experience cannot be imparted in a short time.

When we went for the equipment consultation, a total of 14 (!!!) couples were guided through their equipment selection in parallel.

Best regards,

Dirk
 

Similar topics
01.03.2011Cost of architect services for prefabricated house13
26.12.2012Prefabricated house / solid house, which construction companies?16
17.09.2017Prefab House Forum - Complete house possible for 150,000?29
29.08.2013Prefabricated house (wood) vs solid construction (stone on stone)11
23.06.2014Prefabricated house or solid construction - what is your opinion?45
16.09.2014Ventilation in prefab houses (wood frame with ETICS) also in solid houses?36
26.04.2015Semi-detached house architect or general contractor / prefabricated house or solid construction13
24.08.2015Can I afford a prefabricated house?60
04.07.2016Multi-family house with 3 or more apartments as a prefabricated house18
02.12.2016Is cost calculation for a prefabricated house feasible? Are there additional costs?26
22.12.2016Which is the cheapest prefab house with the largest number of rooms?12
21.02.2017Renovate the core of the old house or build a prefab house?16
03.05.2017Home construction - Solid house or prefabricated house?33
11.12.2017Prefabricated house in solid construction - Which construction company27
23.11.2024Build a prefabricated house over an old existing basement?18
13.06.2017Payment terms for prefab house75
04.05.2018Electrical installation in a prefab house seems very expensive to us?!23
16.09.2018Demolition of prefabricated house - Who has experience with demolishing houses?24
01.01.2019Affordable homeownership: Buy or pre-fabricated house?31
23.02.2019Prefabricated house 1980 - Very well maintained condition16

Oben