So if I remember correctly, our kitchen studio (of course after the contract was signed) gave us a kitchen plan that had to be taken into account during the shell construction. To create this, the kitchen studio wanted to have the floor plans, I believe. A detailed planning or measuring was done by our kitchen studio shortly after the screed was laid.

In other words, sequence (for us):

1. (Rohbau) planning (including architect)
2. kitchen planning (rough)
3. house expansion planning (pipes etc.)
4. electricity / piping
5. screed
6. kitchen measurement (final adjustments)
7. flooring

All without guarantee as it is from memory.
7. Electricity
 

milkie

2014-02-11 18:05:57
  • #2
Yes, that's probably how we will do it to ensure that all connections, windows, and doors are in the right place. So let's wait for the next plan to see if it fits correctly, then we'll go to the kitchen studio and then we'll submit the plans. Thank you!
 

One00

2014-02-15 11:04:48
  • #3
At the risk of writing the same thing as most before me: we made an early rough kitchen plan because we wanted to adapt the layout to our kitchen. We have a floor-to-ceiling window, which was planned exactly between the (half-)island and the cabinet wall. Then the layout was precisely worked out and sent to the kitchen salesperson for "checking". Once everything is finished, the men come by, take the measurements, and place the order for the kitchen.
 

milkie

2014-02-15 11:56:14
  • #4
That is exactly how we will do it. At the moment, our floor plan is still with the architect for revision. We definitely need this now to know how the two "inflexible" doors to the hallway and the storage room are positioned. However, the windows and sliding door to the pantry should be aligned with the kitchen. Have you then ordered the kitchen directly, negotiated the price, and selected the fronts and everything?

Best regards, milkie
 

One00

2014-02-15 13:15:40
  • #5
Yes. With emphasis on "negotiation"
 

Similar topics
09.02.2015Floor plan of a single-family house with a living basement on the slope38
05.06.2014Opinions and tips on our floor plan12
18.05.2016Help needed with window arrangement!32
06.08.2014Do you find the floor plan of our city villa okay?46
23.01.2015Floor plan - what do you say?25
10.11.2015Single-family house floor plan planned, we like the windows43
22.01.2016Kitchen planning with island and floor-to-ceiling windows12
11.02.2016Windows / Doors / Wardrobe13
07.04.2016Optimized floor plan - your opinion is needed!10
14.06.2016Opinion on floor plan16
07.07.2016Floor plan of our bungalow82
23.10.2016Floor plan: Critical feedback very welcome :)36
10.11.2016Critical feedback on the floor plan desired17
19.05.2018Floor plan of new single-family house: Are window/door/interior wall size/arrangement okay?20
22.06.2018Self-created floor plan - opinions and feedback wanted46
20.09.2018Idea collection floor plan single-family house, open construction method43
08.07.2019Bungalow 135 sqm: Floor plan + windows104
21.01.2020Single-family house 130-140 m² floor plan planning173
14.07.2021Floor plan design for a single-family house 230-235 m² on two full floors83
13.05.2022Built-in furniture for hallway etc. from the kitchen studio?17

Oben