modern Bauhaus, lots of glass, 170 sqm ground floor/upper floor, currently in phase 3

  • Erstellt am 2021-02-07 19:03:31

11ant

2021-02-08 19:36:57
  • #1
The OP never stated such a reprehensible motivation, but merely dismissed the warning by saying that the Gänzlichandershaus is also a gain for the neighbors if you want to look at it that way. And I say, no, better forget that, I don’t think they’re happy about it. It’s pretty heated here at the moment; as the OP I would also keep a low profile until the lead smoke in the air has cleared — that’s safer. The presumably hoped-for comments (oh, try this dove blue, that’s nice too) are not coming at the moment. Maybe he is waiting for me to strike a conciliatory tone and, for example, point to the thread by .
 

Lote1971

2021-02-08 19:37:32
  • #2
Hello dear construction community,

I did not expect such an active discussion. Our design is therefore polarizing.
We already thank you all.

Here first the details of the planning costs:

37,273 A+D, LPH 1-7 minimum rate
22,539 A+D, LPH 8 maximum rate
12,000 Statics via A+D at flat rate
1,575 Planning basis LPH 0
0 Media coordination via A+D
1,838 Verifications via A+D
700 Surveying
1,000 Soil investigation, with Z-O verification
720 Official fees application

77,644

92,397 gross
 

benediktr

2021-02-08 20:30:28
  • #3


How am I supposed to understand that :-) You definitely can't compare the planning costs with mine...
 

Lote1971

2021-02-08 20:40:02
  • #4
Did you manage with your initially planned budget for the house construction?
 

benediktr

2021-02-08 20:52:18
  • #5


We are still building and had plastering done 2 weeks ago. According to the current projection, I am on track. However, it must be said that a lot of own work and good connections are involved here. In return, a higher standard, such as KNX, continuous parquet flooring, high-quality windows, lime plaster. Own work includes water/sewage installation, heating, electrical, drywall, roof insulation, and the usual like laying floors and painting. We only had a permit plan signed off by an 85-year-old architect and assigned the rest ourselves. The shell builder is an acquaintance who has already built the 3rd house in the family.
 

Lote1971

2021-02-08 20:56:03
  • #6

Great, then good luck!
 

Similar topics
06.04.2015Our financing with "own contribution"12
09.12.2015Incorrect material delivery for in-house work15
13.07.2017Which personal contribution is worthwhile in house construction?39
27.06.2018Prefabricated house provider with electrical installation as own work14
23.07.2018Financing project as a single with a lot of own effort22
02.07.2019Own contribution in financing a single-family house11
25.02.2020Assessment of construction project with own labor as well as financing27
03.06.2020Construction cost calculation single-family house architect without own work52
05.06.2020Self-performance single-family house with basement - What is feasible?14
09.08.2020Bank does not accept own contribution206
12.08.2020How to correctly determine the loan amount when there is a lot of personal contribution?15
28.08.2020Assessment of own performance and craftsman's hour10
03.02.2022BEG WG grant option - is personal contribution possible?12
24.03.2022How to realistically assess personal effort?32
16.02.2023Painting new construction by own effort32