Hello,
the service will come on August 30th, also because of some other defects. Let's see what they say about the door.
We also have two seals, one on the door and one on the frame. When the door is closed, I can get my little finger in from the outside above the lock between the door and the frame, and it is similar at the lower edge of the door.
Best regards from [Bayern], which is once again rainy today
 

Weimy

2016-08-09 10:19:22
  • #2
Send the complaint of defects with a deadline by registered mail (not delivery confirmation!), so that you have proof of delivery. Then I would consider appointing an expert. We often have heavy rain here, which splashes against our front door, although we have a canopy, water has never entered the house and our front door is now 16 years old. Therefore, I expect higher tightness from a modern front door. What does the Blower-Door-Test say??
 

Payday

2016-08-09 20:10:35
  • #3
just by the way, with us the water also splashes heavily against the front door during heavy rain, which then gets really wet. inside it is still absolutely dry. water must not come in through windows or doors as long as the water does not accumulate more than 20cm+ outside (flooding). by the way, that is also what is meant by "not waterproof". with hydrostatic pressure due to flooding, the door cannot hold tight. otherwise, of course the door must be tight, if only because of the blower door test and other energy loss.
 

Bieber0815

2016-08-09 21:20:07
  • #4

Yes, registered mail with delivery. This is also legally effective if the recipient is not present -- and is cheaper than registered mail with a return receipt, which you probably mean. Proof of delivery can then be found at weh weh weh deutschepost dot de. And then the receipt of the notice of defects with deadline setting can (quite certainly) be proven. That is what matters if it should go to court after all.
 

Weimy

2016-08-10 10:18:25
  • #5


That may be, but I prefer to have proof in paper form with a signature! Every lawyer and court wants it that way... I wouldn’t care about a few euros! Recipients come up with the most incredible stories about why they didn’t receive the letter...
 

Peanuts74

2016-08-10 10:22:37
  • #6
How do you ultimately prove what was actually in the letter? I mean, just because you have proof that "a letter" arrived, that doesn't yet prove what was inside...
 

Similar topics
29.02.2012What can be detected in a blower door test, which house values?18
21.07.2015Price? City villa 158 m², KfW70, KS+WDVS, "upscale" fittings29
30.08.2015Front door: 3- or 5-point locking without automatic locking system?14
27.05.2015Front door made of natural oak?11
17.07.2015Front door with Ekey (Fingerprint) but without panic function15
25.10.2015Front door - door code or fingerprint?36
01.12.2020Front Door Equipment and Costs / Prices25
23.03.2016Front door, manufacturer?, affordable23
26.01.2021Front door - plastic or aluminum56
26.04.2016Front door with frosted glass20
09.07.2016Which documents must the BT hand over at the transfer? KfW70 ETW14
25.01.2017Blower Door Test for KfW 70 according to the 2012 standard?15
27.01.2022Front door, which manufacturer?15
07.02.2020Blower Door Test - Meaning of the Result35
15.08.2018Is an offer binding or are deviations allowed?77
08.10.2020Is the general contractor payment plan acceptable? Thanks for tips68
19.12.2019Blower Door Test 1.7 with two hints22
21.01.2021Exterior plaster is uneven, window sills are too short, tightness of the ETICS (External Thermal Insulation Composite System)63
06.01.2024BBQ - Construction-accompanying Quality Control42

Oben