Sloping plot - and this is really a slope and the budget doesn't work. Simply building into the mountain, whether a bungalow or with a basement, costs. Excavation, slope retaining, the slope-side wall is designed as a retaining wall, reinforcement in the foundation slab, etc. The outdoor area, terraces yes are possible, but only with earthworks and retaining walls.
For 180,000 you get a simple small bungalow on a flat plot. To reach Nordlys' budget, own contribution is already necessary and not just a little.
For Tim Müller. Nordlys had a bungalow built relatively cheaply turnkey. Questioned every expense, do I need that, etc. Very disciplined.
For 180,000 you get a simple small bungalow on a flat plot. To reach Nordlys' budget, own contribution is already necessary and not just a little.