I believe you. You also have to start planning early enough. The installation of the racks and modules took place in the last week of October. But the modules were already installed in August. The order for the installation was placed at the beginning of September, just as the shell construction was starting. If you want a good price, then it doesn't work with a contractor who has long lead times and consultants/salespeople. They all want to be fed. Some courage and willingness to rethink when difficulties arise is required.Congratulations that you were lucky enough to find someone like that. In our area, they usually say, "If you buy the stuff online, then you also have to find someone online to install the stuff for you," or "I will install the stuff for you but without any warranty; if you want it installed with a warranty, I have to charge double."