Depends. We filled the driveway over 1.5 m, you can easily see rutting and a small depression. Terraces that are frost-free founded and well compacted should have no problems at all. Much lower load. If the excavation soil from the basement was simply dumped without proper compaction, then wait 1-2 winters before you build the terrace.