Heinz von Heiden is like Town & Country. It can work out well, but it can also go badly wrong. €1,780 / sqm is more than just cheap, especially for kfw55. Is the foundation slab included?
 

BertramK

2021-06-19 18:21:55
  • #2
Yes, base slab and development are included
 

Acof1978

2021-06-19 18:26:39
  • #3
However, the price will hardly be maintained by Heinz von Heiden. Even €2,000 / sqm will hardly be possible, especially with current prices. Have the construction service description checked, for example, by Bauherrrenhilfe.
 

11ant

2021-06-19 19:45:33
  • #4
Where do you want to downsize?
 

Pinkiponk

2021-06-19 19:56:41
  • #5

Simply cross out from the list what is not relevant for you. As soon as I know the individual items in euros, I can gladly add them later. But it will take a little longer.

We are building in the district of Leipzig. Would you like to tell us in which region you will build?



















































































Allocation of house number
Transmission of data from cadastral map
Certificate of the statutory pre-emption right
Court costs for land register annotation
Entry in the land register, deletion of annotation
Cost invoice for notarization of land charge
Review of offer/contract house
Information from building encumbrances register
Property maintenance until start of house construction
Kitchen
Garage/carport with workshop/tool shed
Outdoor facilities
Garden and tool shed
Refreshments for craftsmen
Tips for craftsmen
Double burden of rent and loan payments
Move
Construction supervisor/building expert/building surveyor
Topping-out ceremony
Housewarming
Building permit (simple)?
Structural engineer
Police road closure
Confirmation of KfW funding criteria
Lawn/hedges/bushes
Mailbox





















































Earthworks
Gravel (cleaning layer)
Base slab
Formwork foundation
Scaffolding
Shell construction
Roof frame
Bricks
Drainage
Concrete
Eaves flashing
Statics
Building material (gravel/sand)
Scaffolding
Chimney
Construction power/water
Building application and architect’s services
































































Property transfer tax
Notary costs
Broker’s commission
Property tax (notice)
Gas connection
Public drinking water supply
Confirmation of secured development
Telephone connection
Public sewer system
Notice drainage application
Electricity connection
Soil investigation
Surveying/site plan
Site plan 1st amendment for building permit
Site plan 2nd amendment for building permit
Development plan
Sewer connection
Entry of land charge in land register
Miscellaneous
Statics






































































































































Roof pitch 30° instead of 22°
Increase in storey height by 20cm
Additional interior wall
Additional interior door
Additional glass interior door
Additional shower
Windows according to our plan
Electric roller shutters instead of manual
Somfy-Tahoma box (central control)
Intercom system
Network sockets
High-voltage connection
Additional outdoor water tap
Floor drain
Diffusion-open wall construction
Surcharge for underfloor heating
Flat plate collectors solar system
Chimney
Photovoltaic system
Plastering works
Wallpapering
Floor coverings ground floor 65 sqm
Floor coverings upper floor 57 sqm
Attic folding ladder
Grilles for all windows/doors
Window reveals
Window shutters
Base slab
Permit fees
Statics and possibly review statics
Surveying and fees
Construction site setup
Construction power, construction water, energy costs
Earthworks
Sewer works
Disposal, container
House connections
Inspection of subsoil, regulations, soil report
Building application and architect’s services
Statics
Individual exterior wall design
Preparation
Material sample selection
Building permit fee Saxony














































Entrance door
Doors
Windows
Skylights
Interior plaster
Paint
Tile adhesive
Tiles
Fireplace + connection
Paint
Stairs
Windowsills
Exterior plaster
Gutter
Laminate



































Heating system (gas condensing boiler with solar thermal)
Heating system accessories (buffer etc.)
Underfloor heating
Thermostats
Pipes for domestic water
Pipes for wastewater
Washbasin
Fittings
Toilet
Bathtub + shower tray
Towel radiator


































Electric cables
Flush-mounted boxes
Small parts
Lamps
Distribution board
Electricity meter
Earthing busbar
Meter registration
Acceptance of electrical installation
Foundation earth electrode
Satellite/cable system






















Builder’s liability insurance
Construction performance insurance
Accident insurance for construction helpers
Home and property liability insurance
Fire shell insurance
Completion insurance
Builder’s legal protection




 

ypg

2021-06-20 02:13:31
  • #6
Up to 30cm, no more. But a lot of things got mixed up there. I think that is confusing.
 