myDoering
2021-04-19 16:21:28
- #1
OK - I didn't think about the schedule. But then you are obliged to also carry out the points in the schedule.
Well, there isn't really an "obligation":
"every energy renovation measure of an iSFP, for which the bonus is applied for, must be implemented within a maximum period of 15 years after the creation of the iSFP. However, the iSFP bonus is granted from the first measure onwards and is not reclaimed if the iSFP is not fully implemented within 15 years.
If you do a measure outside this plan, you don't get any funding. Of +5%. You don't have to repay anything. Theoretically, the schedule is fulfilled with one measure.