Follow-up financing experiences. What has this brought upon you?

  • Erstellt am 2018-04-18 10:43:46

Alex85

2018-04-18 21:24:38
  • #1
So far, we have not had to refinance. On the contrary, we are currently €20K under budget, hope it stays that way. It’s being immediately used for unplanned goodies...

Warning, outing:
We will implement KNX BECAUSE MY WIFE WANTS IT!!
I don’t understand the world anymore! The ETS is already here.

We have planned an additional €20K buffer (extra equity), plus €25K for a carport, €25K for the outdoor area. If something goes wrong, money will be taken from there if the buffer is not enough.
 

Alex85

2018-04-18 21:40:26
  • #2
Oh yes, we did forget something, 600€ for a multi-utility house connection, which is now required after all. However, the house connections are generously calculated, so this will be balanced out in the calculation. And 200€ fees for the water authority for the permit to use RC gravel, for which the earthworks will be 2500€ cheaper.
 

Zaba12

2018-04-18 22:18:53
  • #3

Congratulations on the buffer and your wife
 

Knallkörper

2018-04-18 22:28:17
  • #4
Since the question came up: Yes, it is possible to specify a buffer in the bank financing request.

In general, it is not unrealistic at all to accurately calculate a house construction. I sometimes calculate projects in plant construction, so the budget calculation for the house was quite easy for me. Anyone who understands something about this or hires someone accordingly should be accurate to within 3%, and with the same probability calculate too much or too little.
 

hemali2003

2018-04-18 22:55:28
  • #5
In my eyes and based on really thorough research, I planned a 10-20% buffer and we still had 20k in top. We are very cautious, but of course the budget was limited. Ultimately, it got really tight. Do yourselves a favor and don’t calculate too narrowly. For us, it was the typical things: many items underestimated (out of ignorance), a few items not considered (even though I dealt intensively with the cost breakdown for months), a few additional wishes during the construction phase, underestimated personal contribution. If we still had a few thousand left, we would commission the outdoor facilities – because we really don’t feel like it anymore.
 

ONeill

2018-04-19 06:45:30
  • #6
We spent the planned 20,000 euros on the outdoor area. Then borrowed another 5,000 euros from family (parents) and saved a few thousand euros during construction. So we ended up with about the 10% necessary buffer. [emoji4]

Besides unexpected small costs in the additional expenses, which just add up, 5,000 euros for a steeper roof and thus a possible attic was a cost driver (necessary without a basement), earthworks naturally a few thousand euros more expensive, even though generously planned. Electrical work a bit more than planned and of course the equipment a few thousand euros more. [emoji4]

But all very relaxed. With a good salary, the outdoor area will be done this and next year and the short financing from the parents is directly paid off with bonuses. [emoji4]

But I consider a 10-15% buffer realistic in normal cases. If you are very disciplined or have planned individual items generously, whereby that is a buffer distributed over individual positions, it can work without. [emoji6] But rather rarely.
 

Similar topics
09.06.2013Costs of earthworks without basement15
22.08.2013Are the estimated costs of the general contractor for earthworks reasonable?12
07.03.2014Earthworks are starting, but I need a tip.12
26.04.2016Sand, gravel, and other earthworks32
28.09.2016Evaluation of earthworks offer14
08.12.2016Financing KfW55 efficiency house, land and outdoor facilities19
28.08.2017Earthworks: Making the right choice of provider14
29.12.2017Is it possible to found a single-family house without concrete and earthworks?21
03.02.2018Planning of the complete garden / outdoor area10
25.01.2018Earthworks and shell construction, who bears the warranties?10
05.06.2018Outdoor area - Tasks - Hiring a landscape gardener19
29.10.2018Earthworks in the construction performance description17
29.11.2018Ideas for outdoor areas, garden, garden landscaping - suggestions, tips?51
08.04.2019Earthworks costs in Bavaria15
14.06.2019Costs for earthworks18
16.03.2020Outdoor facility - Neighbor has already built a wall15
08.09.2020Earthworks costs, hillside house14
23.07.2021Earthworks... Dispute with the occupational disability insurance20
03.10.2021Is refinancing possible after just 2 years? (for outdoor facility)21
28.08.2023Electrical outdoor installation - thought of everything?13