Andii87
2022-02-20 13:55:54
- #1
Hello, the windows were assigned by the architect/developer. We bought the apartment turnkey from the developer, meaning we basically only have to accept it once at handover. The screed seems to be fine, the room height also corresponds accordingly. I’m not sure whether this is a “normal” construction method (and if so, whether it can be called floor-to-ceiling) or if it was only done because something was not properly installed. At least it’s the same in all the apartments.