I did it like this. Almost everything as a one-man show. Including planning, statics, drawings, and building application. I have a master carpenter who is officially the designer and my construction manager. I also did the earthworks completely by myself. So far, only the surveyors, the window installers, and a construction company that was on site for 4 hours to pour the slab. And for 5 weeks a master carpenter with whom I framed and erected the shell. This will be a city villa with a recessed top floor and 192 m² of living space. [Vorgehängt Hinterlüftete Faserzementfassade], extreme insulation, ventilation system, parquet flooring, sauna, and all that jazz, and in the end it will cost around 250k. So there is plenty of potential for savings! I wish you lots of success!