FlohJoe
2017-01-01 13:07:01
- #1
Hello,
my wife and I want to build this year. After several viewings, we have decided to have a solid house built. I have the construction service description.
We have already chosen a plot of land and discussed the equipment of the house. The broker for the plot, which is about 650m² in size, is still missing in the cost plan itself. The excavation can be distributed on the property, as it is slightly sloping.
What still has to be done by ourselves are the walls, ceilings, and floors. The bathrooms are finished.
Feel free to ask me questions so that I can take as much into account as possible. This is completely new territory for me.
Best regards
Flo

my wife and I want to build this year. After several viewings, we have decided to have a solid house built. I have the construction service description.
We have already chosen a plot of land and discussed the equipment of the house. The broker for the plot, which is about 650m² in size, is still missing in the cost plan itself. The excavation can be distributed on the property, as it is slightly sloping.
What still has to be done by ourselves are the walls, ceilings, and floors. The bathrooms are finished.
Feel free to ask me questions so that I can take as much into account as possible. This is completely new territory for me.
Best regards
Flo