square floor plan, the attic is directly above the ground floor (still not supposed to be developed ;) with a 0.5m knee wall.
Ground floor:
10m x 10m x 3.10m = 310m³
Attic (knee wall):
10m x 10m x 0.5m = 50m³
Attic (roof slope):
10m x 10m x 5m :2 = 250m³
Total attic: 300m³
Since the attic is not supposed to be developed, you only calculate it at one third. -> 300m³ : 3 = 100m³
Accordingly, I come to a building volume of 310m³ + 100m³ = 410m³
According to the calculations from the previous plan and research on the internet, I have estimated costs for a turnkey house at €350 per m³.
410m³ * €350 = €143,500
Let's round that up to about €150,000
This number seems so small... Do I have a mistake in my thinking? Can't the attic be calculated at one third? (If I calculate it fully I come to: 310m³ + 300m³ = 610m³ -> 610m³ * €350/m³ = €213,500)
I hope you can make sense of my calculation and help me through my sleepless nights...
Thanks in advance
unfortunately I can't reach my architect this week... so I sat down myself and calculated the following:
square floor plan, the attic is directly above the ground floor (still not supposed to be developed ;) with a 0.5m knee wall.
Ground floor:
10m x 10m x 3.10m = 310m³
Attic (knee wall):
10m x 10m x 0.5m = 50m³
Attic (roof slope):
10m x 10m x 5m :2 = 250m³
Total attic: 300m³
Since the attic is not supposed to be developed, you only calculate it at one third. -> 300m³ : 3 = 100m³
Accordingly, I come to a building volume of 310m³ + 100m³ = 410m³
According to the calculations from the previous plan and research on the internet, I have estimated costs for a turnkey house at €350 per m³.
410m³ * €350 = €143,500
Let's round that up to about €150,000
This number seems so small... Do I have a mistake in my thinking? Can't the attic be calculated at one third? (If I calculate it fully I come to: 310m³ + 300m³ = 610m³ -> 610m³ * €350/m³ = €213,500)
I hope you can make sense of my calculation and help me through my sleepless nights...
Thanks in advance