Hello everyone,
we (my wife, two children and I) are currently planning the construction of a single-family house in the Berchtesgadener Land. The plot is already in family ownership.
The framework conditions would be as follows:
- Plot available, approx. 800 sqm
- medium standard
- solid brick house (without insulation; possibly 43 cm bricks)
- Floor plan approx. 12 by 10 m:
- Two full floors
- with basement (only utility cellar)
- cold attic
- double garage
For this, our architect prepared a rough cost calculation, the result of which almost overwhelmed us (see attachment). Our budget is actually only up to approx. 600 - 650 TEUR "all in".
How high would you estimate the turnkey costs approximately?
Regarding the estimate itself, I also have a few questions:
Thank you very much for your efforts and answers and best regards
Aracnor

we (my wife, two children and I) are currently planning the construction of a single-family house in the Berchtesgadener Land. The plot is already in family ownership.
The framework conditions would be as follows:
- Plot available, approx. 800 sqm
- medium standard
- solid brick house (without insulation; possibly 43 cm bricks)
- Floor plan approx. 12 by 10 m:
- Two full floors
- with basement (only utility cellar)
- cold attic
- double garage
For this, our architect prepared a rough cost calculation, the result of which almost overwhelmed us (see attachment). Our budget is actually only up to approx. 600 - 650 TEUR "all in".
How high would you estimate the turnkey costs approximately?
Regarding the estimate itself, I also have a few questions:
[*]In your opinion, is this a turnkey estimate (apparently no equipment was considered)?
[*]GFA: Is the basement counted here the same as the ground floor and first floor (at least it looks like 360 sqm)?
[*]GFA: In calculating the GFA, I arrive at somewhat different values. Is estimating based on GFA appropriate here? Or should one rather estimate based on "enclosed space" due to the cold attic?
[*]Are any architect fees included in the additional costs?
Thank you very much for your efforts and answers and best regards