Closing large wall gaps

  • Erstellt am 2021-01-11 16:05:31

Gette094

2021-01-11 20:40:12
  • #1


Basically, you are completely right about that!
However, I accept it because I don’t want to mill even more or deeper chases. The DIN standard also requires empty conduits in this case, but I do not want to implement it.

Where I will use empty conduits, however, is on the route between the intercom/motor lock and the distribution cabinet.
 

Gette094

2021-01-11 20:47:04
  • #2
So, do you install cables to luminaires in a separate slot? Please enlighten me.. What if I operate decentralized actuators in a KNX solution.. could they still light up then? :))
 

Similar topics
02.06.2016Conduit Costs - Network, SAT, Backup14
24.05.2024Planning empty conduits for satellite system and photovoltaic system14
23.07.2020Empty conduits on the property - ideas? - It's not too late yet :)103
09.09.2019Are empty conduits and empty boxes in WU concrete dangerous?10
14.02.2021Empty conduits from the house to the garden / Tips10
04.07.2022Conduits for SAT and TK, mandatory or not in new construction?13

Oben