Raiweired
2022-05-02 15:37:43
- #1
The contract says nothing about the handover or inspection of calculations. It states that a heat pump from Buderus 196i-AR13 will be installed and that underfloor heating will be installed on the ground floor and the upper floor, with a laying distance of 15 cm and 10 cm in the bathroom.