Building maintenance land in Hochwald/Hunsrück - Current development costs?

  • Erstellt am 2022-06-29 15:14:39

gerrard87

2022-07-01 09:38:08
  • #1

So on the internet (general research) it says development costs are about €12-15k, which as I understand includes connections, right?

It’s about plot number 185, as you can see it is within construction phase 1 and is also shown in the development plan. Adjacent plots (within the street) are already sold or reserved. So one can assume that the municipality would also be interested in the plot being built on, right?

 

K a t j a

2022-07-01 10:08:54
  • #2
Answer the question of whether there is already a street!
 

ypg

2022-07-01 10:33:19
  • #3

These are connection costs (sewage/water, electricity, telecom, possibly gas..)
On the internet, such an amount for development costs cannot be given, as it cannot be answered in general. See above.
I would not speculate that the city is interested after all. First, _you_ are interested.
I would submit a preliminary building inquiry and seek direct contact with the building authority. The preliminary building inquiry is in writing and provides security.
 

gerrard87

2022-07-01 11:17:12
  • #4
Hello, no not yet but the municipality has already budgeted 55k euros for the development of the construction area for 2022/23. So something is already underway.
 

K a t j a

2022-07-01 11:48:27
  • #5
I consider the risk to be too high. If there is no definite date with a completion deadline, I would stay away from it. Unless you have the money to spare and it doesn’t bother you if it takes another 5 or 10 years until the house is built. What does the head of the building authority of the municipality say? I would definitely try to get some information from him.
 

Similar topics
22.08.2013Plot - Decision?14
30.01.2014Preliminary building inquiry before purchasing property okay, can this information be trusted?15
09.04.2014Questions/neglected plot/meadow, determining construction measures44
19.02.2015Development costs §127 Building Code12
02.07.2015Development costs for gas and sewer pipelines11
17.06.2016Further procedure in case of rejection of the preliminary building inquiry35
16.07.2016Purchase Agreement for Land - Building Window - Preliminary Building Inquiry12
30.01.2017Development costs and information before property viewing10
13.05.2018Development costs for subsequent construction10
19.10.2019Development costs / House connection costs11
25.02.2020Assessment of property sought - Article 34 redevelopment11
23.08.2020Building application for a developed plot in the outer area23
29.03.2021150 Euro / sqm development costs = realistic or usury?58
24.11.2021Plot of land in sight - looking for tips, tricks, suggestions39
27.09.2021Financing the construction of a house on a plot of land based on the neighborhood33
01.07.2022Floor plan of a single-family house approximately 190m² and placement on the plot22
14.03.2023Finance buying land or rather leave it?60
13.03.2023Preliminary construction inquiry for land purchase: What should be considered?24
22.05.2023Agricultural land expected for commercial use - long narrow plot19
10.07.2024Land financing, variable loan?20

Oben