Hello everyone,

last summer I discovered a developer who is realizing a great project. After many hours, questions, plans, etc., the purchase contract for a condominium was finally concluded in November, and since then I have been busy planning, bathroom first, then kitchen. Last week, I noticed that I have the wrong plans. Luckily, I am just sick enough that I don't quite understand it yet, but yes, my previous planning was in vain.

Windows were moved or removed. I hope I will somehow manage with that in the kitchen, but it presents real problems in the bathroom. Since I am so out of sorts right now, I’m even considering undoing the purchase contract. I can't think of any solution to reasonably fit everything I want in the bathroom with the new window. Not to mention the issue of connections. Is there any good point of contact for this problem? I already saw the bathroom planner, but as it turned out, this plan would not have been feasible because some walls or windows were not correctly placed. So my trust there is limited now.

I am grateful for any idea. The developer sent me the correct plan with a proposal, which I unfortunately do not like. I don't find the position of the toilet and bidet good, the bathtub will not be freestanding, which I simply cannot afford financially. And the shower absolutely has to be walk-in and 90 cm wide with a bench solution. I am attaching a picture of the plan and look forward to what comes. Maybe someone has a very similar floor plan – intentionally! – and found a great solution.

Thank you very much
 

jens.knoedel

2024-01-24 12:59:11
  • #2

How can that happen?

By whom and why?

Floor-to-ceiling window?

Which plan?

Why should the developer do that? I see you as the buyer – eyes shut and push through. As a developer, I certainly wouldn’t let you leave again today.

That’s in the plan. You can walk right in and it’s 90 cm wide. Why absolutely a bench? And how do you envision it?

What is your wish? Then just a non-freestanding bathtub.
 

Costruttrice

2024-01-24 13:19:11
  • #3
After I read your text, I expected God-knows-what, but I don't find the plan as catastrophic as you write. You don't have to design the bathtub freestanding. You can integrate a seat bench into the shower; the desired width is given. What exactly is the problem? Show me your original bathroom plan.
 

Tigger baut

2024-01-24 13:44:38
  • #4
Fortunately, it happened now and not only when the kitchen planner comes to take measurements... It was simply a mistake, plans were changed and not sent or communicated to me. It can happen, but for me it is a problem because trust also suffers. I would have liked floor-to-ceiling windows, but according to the developer it was not possible because a permit would have been required. The old plan is attached. I will raise contract cancellation as an option, he can’t say no to that anyway. So far, the offer has been to modify the already finished components afterwards – that is, patch holes and make new ones elsewhere; I can't imagine that is a good idea. I need the bench seat because my 74-year-old mother will move in with me and I already have to think ahead a bit; showering while sitting is eventually easier than showering standing up.
 

jens.knoedel

2024-01-24 13:54:50
  • #5
In summary: The developer’s plan can also be implemented with a non-freestanding tub. The bench can be integrated into the shower. ==> Problems solved that aren’t really there (except in your wishful thinking) Get a discount because of the changed plan and look forward to a great bathroom.
 

Tolentino

2024-01-24 14:07:04
  • #6
I find the new plan even better than the old one. I don't understand the specific problem with the plan, except that plan changes simply were not communicated. I can understand the frustration about that much more easily. But then there is a clarifying conversation and that’s that.
 

Similar topics
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
01.03.2015The developer does not build according to the plan14
13.06.2015New construction with developer / construction drawing documents23
24.04.2017Lighting in hallway and kitchen: Are recessed ceiling spotlights needed?19
12.05.2016Individual bathroom planning despite the developer (and saving money...)14
14.11.2016Soundproofing - weakest link? (Windows?)26
05.01.2017Bathtub in front of the window - parapet height?14
22.05.2017Almost every window has scratches - what is considered normal?22
29.01.2018Windows on the roof terrace are installed "strangely".21
23.11.2018Floor plan draft of a semi-detached house with basement - Hope for your feedback37
06.09.2019Is it no longer allowed to open the windows with a ventilation system?15
08.05.2020Optimize OG Stadtville. Floor-to-ceiling window104
09.06.2020False statement by sales partner at developer12
16.08.2020Bathtub misaligned - defect?15
23.02.2023Consultation: New bathroom, 5.9 sqm with bathtub48
02.11.2021Bathtub in front of window, railing too low, contractor is obstructing48
30.03.2022Developer New Build: Buy two apartments and then combine them18
22.12.2024Floor plan changes for end-terrace house from the developer133
25.12.2023Behavior in case of imminent delay by the property developer48
23.12.2023Broken tiles warranty? New apartment from the developer13

Oben